I'm amazed that nobody has picked up on the huge delays that the ecml has suffered throughout the day, because of a failed Eurostar at Ally Pally. Trains were blocked in London for several hours while the train was removed. All southbound trains had to terminate at Stevenage.
Subsequently, many trains have failed to gain back lost time, and virtually all GNER services were still running about 30-45 minutes late at 15:00.
The Highland Chieftan for example was delayed by about 40 minutes (which allowed me to get a good pic of it passing Manors
)
Subsequently, many trains have failed to gain back lost time, and virtually all GNER services were still running about 30-45 minutes late at 15:00.
The Highland Chieftan for example was delayed by about 40 minutes (which allowed me to get a good pic of it passing Manors
