Island Line Upgrade updates

Status
Not open for further replies.

Gloster

Established Member
Joined
4 Sep 2020
Messages
8,289
Location
Up the creek
The Isle of Wight County Press does a daily travel news update on its website (www.iwcp.co.uk) which includes Islandline, although it is sometimes a bit slow to react to changes after the morning rush.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

alex397

Established Member
Joined
6 Oct 2017
Messages
1,546
Location
UK
Plenty (10-15?) of orange folk can be seen around the Pier Head this morning, gathered at the end of the platform and wandering down the track - looks like quite a thorough inspection? https://isleofwightwebcams.co.uk/solent-webcam/

It is closed this weekend between Pier Head and St John’s Road.

I have just been to the island, and what a great experience it is. Sad to see the 483s go from an enthusiasts point of view, and they have lasted exceptionally well. But it is certainly time for them to go - it isn't meant to be a heritage railway after all. Great to see the wooden sleepers, semaphore signals, and to experience the 'clickety clack' of the rails. But you can tell the upgrades are needed! It is incredibly bouncy in places, and I found it amusing to see the 'experience flight' adverts for Hovertravel on the train, while at the same time feeling like I was actually about to experience flight!

On Friday (9th Oct) there also appeared to be a temporary speed restriction, somewhere between Brading and Smallbrook. A railway workman was in attendance. Trains very slowly passed.

While travelling at night, the stations did feel very dingy. Especially Shanklin Station, which appears to be some sort of youth club in the evenings. It wasn't pleasant being alone at the station, with a large group all hiding in the darkness smoking weed and throwing things at me - who then boarded the train while still smoking the stuff (but jumped off before the staff could see them). Hopefully they make the stations a little less dingy during the upgrade.

The railway has plenty of things going for it - and the staff were generally friendly, helpful and chatty. It seems like a good team working on the line.
 
Last edited:

philthetube

Established Member
Joined
5 Jan 2016
Messages
3,746
Sorry if this has been asked, but are the refurbished platforms going to be done to 4 car length?
 

philthetube

Established Member
Joined
5 Jan 2016
Messages
3,746
Neither can I, but I have not seen anything saying that 4 cars would definitely run.
 

philthetube

Established Member
Joined
5 Jan 2016
Messages
3,746
Or a 20 min service with 2 spares, 1 running spare and 1 for overhaul etc. Higher resiliency is needed because of location.
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
8,289
Location
Up the creek
Or a combination: usually 2 in service and one running spare, but maintenance schedules arranged so as to have 2 pairs in use on (those very rare) peak days. The fifth set could be a spare on the day or under longer-term maintenance. I doubt there will be a 20 minute service, just a more even one with better FastCat connections.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
Any idea what's happening on October 31st? They are closing the whole line, on a saturday, for 'maintenance works' which is a bit unusual.

Or a 20 min service with 2 spares, 1 running spare and 1 for overhaul etc. Higher resiliency is needed because of location.

SWR have been very clear about running a half hourly service with trains passing at Brading, hence the new loop - they've said a 20min service will remain possible but I can't recall any commitment to actually run one. Even if they do, operating it often enough to justify extra rolling stock seems unimaginable.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,219
Or a 20 min service with 2 spares, 1 running spare and 1 for overhaul etc. Higher resiliency is needed because of location.
Surely if they wanted to run a 20 minute service they wouldn't have bothered with the cost of putting a loop in at Brading. A 20 minute service makes little sense.
 

Vespa

Established Member
Joined
20 Dec 2019
Messages
1,576
Location
Merseyside
If a passing loop is installed at Brading, with 2 passing loops, you can in theory have 4 tph on the line, it would require perfect synchronisation between trains.
 

K.o.R

Member
Joined
6 Dec 2017
Messages
658
If a passing loop is installed at Brading, with 2 passing loops, you can in theory have 4 tph on the line, it would require perfect synchronisation between trains.

Brading brings it up to 3 loops, which I think would all be needed to run 4tph
 

Dunfanaghy Rd

Member
Joined
16 Sep 2019
Messages
410
Location
Alton, Hants
Or, reality will bite in a year or two's time and SWR (or their successor) decides that double track from Ryde to Smallbrook Jn is a luxury. We shall see.
Pat
 

takno

Established Member
Joined
9 Jul 2016
Messages
5,036
Surely if they wanted to run a 20 minute service they wouldn't have bothered with the cost of putting a loop in at Brading. A 20 minute service makes little sense.
The loop going in at Brading needs a reasonable justification, and the 30 minute service is it.

Not removing an existing loop needs far less justification. Sure you're probably going to have to replace the points and a couple of hundred yards of plain track to keep the existing loop running, but you're not adding a signal box or staff, and you presumably won't need to do any complex trackbed work.

Between the slight increase in operational resilience and the possibility of running 3tph sometimes in the future it seems well worth keeping the old loop.
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
8,289
Location
Up the creek
I doubt there is really a need for a Metro-style 20-minute frequency in the foreseeable future (although foreseeing the future is even more difficult than usual at the moment). One of the main disadvantages would be that you would not gain the convenient connection with the Fastcats, even if they usually only run at half-hourly intervals in the peaks.

Neither Ryde nor Sandown stations are well placed for the town centres and the others are only reasonable: Lake is probably best. The parallel buses run quarter-hourly, even on Sundays and serve the town centres and places such as the Tesco superstore, so you are unlikely to greatly increase the number of local passengers. The main traffic is always going to be through Ryde Pier Head, making good Fastcat connections important.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
Or, reality will bite in a year or two's time and SWR (or their successor) decides that double track from Ryde to Smallbrook Jn is a luxury.


That's not in much doubt, but is it SWR's responsibility to rationalise someone else's infrastructure? Any unnecessary risk and expense for SWR seems hard to justify even if Network Rail wanted to contribute, but they deferred their own scheme to resignal the line (involving a Brading loop) back in 2011/12.
 

Gloster

Established Member
Joined
4 Sep 2020
Messages
8,289
Location
Up the creek
Isn’t the status of the Islandline infrastructure different from the rest of the network? Is it leased from Network Rail by SWR? If so, up to what limits are SWR and their contractors free to make their own decisions as to what work to carry out?
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,181
Isn’t the status of the Islandline infrastructure different from the rest of the network? Is it leased from Network Rail by SWR? If so, up to what limits are SWR and their contractors free to make their own decisions as to what work to carry out?

SWR are responsible for the infrastructure on IL, but still have to work to NR standards.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
SWR are responsible for the infrastructure on IL, but still have to work to NR standards.

As I understand it responsibility is split, both physically (depth below railhead) and in terms of maintenance vs renewals.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,181
On a complete tangent but somewhat related. I believe the tamper that went over to the island is currently working on the 3 new roads at Fratton.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
Some interesting tweets regarding Smallbrook, sounds like an interesting article in Heritage Railway could be on the way?


@MattwicksBMR
Just need to get rid of that fence and buffer stops...

@Marshrail
Shhhhh. Not long

Today they've been moving the two ex-W&C match wagons and ballast hopper, long term residents of the long siding at St Johns, with a road-rail machine for removal:

https://www.facebook.com/groups/355569249197459/permalink/365885454832505/
 
Last edited:

Rick1984

Member
Joined
23 Aug 2012
Messages
1,030
Interesting the road-rail vehicle seems to be a excavator. You can see it's bucket on the flatbed at rear
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
Being loaded this morning.

b.JPG

Edit: They did indeed head to Havenstreet, there's some photos on the railway's C&W Facebook page - seems they are currently being stored on behalf of the contractor Sonic Rail:

 
Last edited:

Gloster

Established Member
Joined
4 Sep 2020
Messages
8,289
Location
Up the creek
Wightlink are to suspend the Portsmouth Harbour-Ryde Pier Head Fastcat service after close of service on the 13 November. No date is given for its return.
 