As part of a London Special DB ticket I am travelling between Koblenz and Dusseldorf on 27th Aug. The ticket was booked about 3 months ago.
Train ICE1028 from Koblenz is due to arrive at Koln at Platform 2 at 10.05
Train ICE 614 to Dusseldorf is due to depart from Koln at Platform 5 at 10.10.
This is the connection offered by the DB site booking engine so I assume it is a feasible connection.
I checked the itinerary today and found this:-
Current information on your itinerary
The connecting train may be missed due to delays. Please listen to local announcements.
ICE 1028, ICE 614: Köln Hbf: Construction work. Ankunftsverzögerung bis zu 5 Min. Anschluss wird ggf. nicht erreicht.
(Google translation
Construction work . The arrival is delayed up to 5 minutes . Connection may not actually be achieved
All information is issued without liability)
Does any one what the construction work is and if I miss the connection what are DB
obliged to do to get me on to Dusseldorf.
Train ICE1028 from Koblenz is due to arrive at Koln at Platform 2 at 10.05
Train ICE 614 to Dusseldorf is due to depart from Koln at Platform 5 at 10.10.
This is the connection offered by the DB site booking engine so I assume it is a feasible connection.
I checked the itinerary today and found this:-
Current information on your itinerary
The connecting train may be missed due to delays. Please listen to local announcements.
ICE 1028, ICE 614: Köln Hbf: Construction work. Ankunftsverzögerung bis zu 5 Min. Anschluss wird ggf. nicht erreicht.
(Google translation
Construction work . The arrival is delayed up to 5 minutes . Connection may not actually be achieved
All information is issued without liability)
Does any one what the construction work is and if I miss the connection what are DB
obliged to do to get me on to Dusseldorf.