Can anyone confirm if the new section of track from Platform 1 to Humberstone Road sidings is now in use? Open Train Times Map still shows the old layout, however it shows a proceed aspect for both platforms 1 and 2 simultaneously, which makes me believe it is in use?
Also, the awfully slow approach on the ‘down’ line (northbound) has finally been upgraded from 15mph to 35mph freight and 40mph pax trains for platform 2. Platform 1 I believe it is 30mph for both pax and freight trains.
Can anyone confirm if the new section of track from Platform 1 to Humberstone Road sidings is now in use? Open Train Times Map still shows the old layout, however it shows a proceed aspect for both platforms 1 and 2 simultaneously, which makes me believe it is in use?
Also, the awfully slow approach on the ‘down’ line (northbound) has finally been upgraded from 15mph to 35mph freight and 40mph pax trains for platform 2. Platform 1 I believe it is 30mph for both pax and freight trains.