Hi, off to visit a friend for the first time in a year+ towards Southend and yet again there are weekend engineering works turning a ~20min journey into nearly 1h30 tube and bus extravaganza.

It seems there has been works on this line at weekend for years. Is there an end in sight?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Aictos

On Moderation
Joined
28 Apr 2009
Messages
10,396
I thought the Liverpool Street works was in connection with longer platforms at Liverpool Street itself for Crossrail?

As to Southend, no idea?
 

JonathanH

Established Member
Joined
29 May 2011
Messages
8,746
I think it has been indicated before that weekend engineering work on the Liverpool Street lines is a fact of life.
 

RailWonderer

Member
Joined
25 Jul 2018
Messages
530
Location
All around the network
GEML users for the past decade like me have mostly gotten into the habit of not travelling south of Ingatestone or Shenfield on weekends because of those wretched neverending engineering works. Take time off work and do your journeys on a weekday or drive if you can't do that.;)
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
19,701
End in sight. OLE nearly done, Crossrail works nearly done. Clearly there will still be disruption from time to time for track work etc.
 

dk1

Established Member
Joined
2 Oct 2009
Messages
10,257
Location
East Anglia
End in sight. OLE nearly done, Crossrail works nearly done. Clearly there will still be disruption from time to time for track work etc.
We will have to think up something else to start. Say 4 tracking Witham-Kelvedon or enhancements to allow 110mph running. Can’t start letting passengers think trains run all the way on the weekends.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,234
Location
East Anglia
Building Beaulieu Park station or whatever it ends up being called (if it ever gets started) should do the trick ;)
 

EssexGonzo

Member
Joined
9 May 2012
Messages
622
We will have to think up something else to start. Say 4 tracking Witham-Kelvedon or enhancements to allow 110mph running. Can’t start letting passengers think trains run all the way on the weekends.

I mean, in Shenfield, we won’t know what to do with a) a high street not clogged up with bustitution vehicles and b) a way of using our station to actually benefit from living 25 mins from Central London.
 

apinnard

Member
Joined
2 Aug 2017
Messages
185
We will have to think up something else to start. Say 4 tracking Witham-Kelvedon or enhancements to allow 110mph running. Can’t start letting passengers think trains run all the way on the weekends.

could do with a connection between the up and down at the country end of Witham for all those times services are started from there on weekends during closures. Quite a lot of bang line from Witham to church road crossing during engineering works.
 

dk1

Established Member
Joined
2 Oct 2009
Messages
10,257
Location
East Anglia
could do with a connection between the up and down at the country end of Witham for all those times services are started from there on weekends during closures. Quite a lot of bang line from Witham to church road crossing during engineering works.
That would help but doesn’t really work out too bad unless they try to run too many trains.
 

Alfie1014

Member
Joined
27 Jun 2012
Messages
914
Location
Essex
could do with a connection between the up and down at the country end of Witham for all those times services are started from there on weekends during closures. Quite a lot of bang line from Witham to church road crossing during engineering works.
Isn’t that the long term plan to relocate the Kelvedon crossovers to the north end of Witham?
If one is going to Southend itself the LTS from Fenchurch St is an option.
Except the LTS has its own programme of OLE renewal now so loads of closures there too!
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
5,474
Location
Peterborough
We will have to think up something else to start. Say 4 tracking Witham-Kelvedon or enhancements to allow 110mph running. Can’t start letting passengers think trains run all the way on the weekends.
ISTR from somewhere that a second phase (pardon the pun) of power supply upgrades is due to take place on the GEML east of Shenfield; the existing Springfield feeder east of Chelmsford has a new air insulated switchgear building and 4 autotransformer bunds in place.

The Mark 1 equipment east of Chelmsford will require renewal soon too.
 

dk1

Established Member
Joined
2 Oct 2009
Messages
10,257
Location
East Anglia
ISTR from somewhere that a second phase (pardon the pun) of power supply upgrades is due to take place on the GEML east of Shenfield; the existing Springfield feeder east of Chelmsford has a new air insulated switchgear building and 4 autotransformer bunds in place.

The Mark 1 equipment east of Chelmsford will require renewal soon too.
They seem to have been working on that feeder station at Springfield for years now. It’s been quite a construction site.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
19,701
ISTR from somewhere that a second phase (pardon the pun) of power supply upgrades is due to take place on the GEML east of Shenfield; the existing Springfield feeder east of Chelmsford has a new air insulated switchgear building and 4 autotransformer bunds in place.

The Mark 1 equipment east of Chelmsford will require renewal soon too.

Power supply upgrades don’t need anything like the disruption of replacing the OLE, though.

And the Mk1 equipment isn’t in too bad shape. It was designed as an AC system from the off, whereas east of Chelmsford wasn’t.
 