Where is the actual location ? No real double track sections on the Cambrian. Were the locos ERTMS ? Seems a little suspicious to me.
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,489
Location
Norwich
Where is the actual location ? No real double track sections on the Cambrian. Were the locos ERTMS ? Seems a little suspicious to me.

Yes, there is. Fairly long sections were installed as part of the ERTMS project between Welshpool and Newtown.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Yes, there is. Fairly long sections were installed as part of the ERTMS project between Welshpool and Newtown.

The location provided in the description of photo seems to indicate it is just southwest of Welshpool, so that would tie up.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,061
Where is the actual location ? No real double track sections on the Cambrian. Were the locos ERTMS ? Seems a little suspicious to me.

It's legit, some colleagues down that way have sent me photos today. It's been causing some disruption too. Presumably since it's a possession no ERTMS is required.

Delays to services between Machynlleth and Shrewsbury
Due to engineering works not being finished on time between Machynlleth and Shrewsbury the line will be blocked. Train services through these stations may be subject to disruption on all routes. Disruption is expected until 12:00 17/01.
Last Updated:17/01/2016 05:48
 
Last edited:

zoro

Member
Joined
3 Apr 2012
Messages
48
The lines here are bi directional. the locos are not ERTMS fitted, but don't need to be when running under an engineers possession, running to a 15 mph speed limit.
 
Last edited:

Retorus

Member
Joined
30 Mar 2012
Messages
257
Where is the actual location ? No real double track sections on the Cambrian. Were the locos ERTMS ? Seems a little suspicious to me.

Seriously? Why on earth would anyone lie about something like this? :lol:
 

topydre

Member
Joined
2 Jan 2012
Messages
188
11:30 from Aberystwyth was 6-cars today. 13:30 to Birmingham Int was shown as cancelled until about 11:30, then became "on time"
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Its at Milepost 35 which is on the double track section between Welshpool and Fron, between Welshpool and the bridge over the Severn at Cilcewydd. The photo is taken from a UWC that is accessed off the A483 Welshpool bypass.

There relaying track between Newtown and Talerddig until March in many places. Coyle Rail are doing it.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Seriously? Why on earth would anyone lie about something like this? :lol:

Not accusing of lying but possibly possibly mistaken. There is a difference between the two.
--- old post above --- --- new post below ---
Confirm not mistaken so apology for suggesting same. As mentioned, T3 Occupation entering site at Sutton bridge and ERTMS dispensed with.
 

zoro

Member
Joined
3 Apr 2012
Messages
48
Not accusing of lying but possibly possibly mistaken. There is a difference between the two.
--- old post above --- --- new post below ---
Confirm not mistaken so apology for suggesting same. As mentioned, T3 Occupation entering site at Sutton bridge and ERTMS dispensed with.

Apology accepted. Lol.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,251
Location
Between Edinburgh and Exeter
Nice phots! Although, while it probably is a first time for a Freightliner Loco to appear on the Cambrian, I gather that it was on hire to Colas Rail for the job.

Colas's NDS work has been picking up a fair bit as of late, leading to them hiring in locos from Freightliner and DBS.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,492
Did the rear loco have it's engine running? if it did why wouldn't they have used that loco's own tail lights?
 

HMS Ark Royal

Established Member
Joined
2 Sep 2015
Messages
2,807
Location
Hull
Its at Milepost 35 which is on the double track section between Welshpool and Fron, between Welshpool and the bridge over the Severn at Cilcewydd. The photo is taken from a UWC that is accessed off the A483 Welshpool bypass.

There relaying track between Newtown and Talerddig until March in many places. Coyle Rail are doing it.

What is a UWC?
 

the-gog

Member
Joined
30 Nov 2005
Messages
115
I was half a mile south of Pete at Cilcewydd: https://www.mylordz.com/picture.php?/914/category/97

The sodding autofocus decided to wander on my just at the wrong moment. Not impressed. 6C70 returned from the worksite at Talerddig under a T3 all the way to Sutton Bridge Junction. Sleepers have been dropped at Penstrowed, and by Lidl/A483 overbridge at Newtown. New rails sit in the 4ft at Newtown station:

https://www.mylordz.com/picture.php?/913/category/97

More rails were supposed to be dropped a week last Sunday, but the machinery to slide the rails off the wagons failed, so it had to be abandoned.
 