"A loop has only one signal section - two signal sections or more is a slow line." - R. Sumner.
As to loop entry and exit speeds, most freight can reach over 40mph (on the flat) in the length of the train, so 50 turnouts are a better choice, IMHO. Therefore the toe to toe length of the loop is the toe-to-CP for the entrance T/O +, 775m (train) + 2x20m (loco and demic) + 5m (inaccurate stopping) + 20m signal standback +a signal overlap (nominally 180m, can be a bit shorter at 50mph) +CP-to-toe for the exit T/O.
The more signalling engineers you put in a room the bigger the bill ...