heart-of-wessex
Established Member
Hello all,
Not sure if it should be in rolling stock but as it's timetable and diagram related, I thought I'd put it here.
On Sunday 21st Feb I see there are some engineering works around Manchester area, I'd quite like to do a SimSig timetable based on it but I need some stock help. RTT already shows formations for Northern which I can get on Sunday when they run, but there is no formations for Avanti, TfW or TPE. I can do the Avanti ones as its easy, solid 11 car 390s all day, but not sure what the TfW or TPE runs will be.
Assuming that most Sundays are a similar set up diagrams wise, would it likely be 175s on the TfW side, and 4 car 350's on the TPE side?
Any help would be most appreciated!
James.
Not sure if it should be in rolling stock but as it's timetable and diagram related, I thought I'd put it here.
On Sunday 21st Feb I see there are some engineering works around Manchester area, I'd quite like to do a SimSig timetable based on it but I need some stock help. RTT already shows formations for Northern which I can get on Sunday when they run, but there is no formations for Avanti, TfW or TPE. I can do the Avanti ones as its easy, solid 11 car 390s all day, but not sure what the TfW or TPE runs will be.
Assuming that most Sundays are a similar set up diagrams wise, would it likely be 175s on the TfW side, and 4 car 350's on the TPE side?
Any help would be most appreciated!
James.