As people will be aware parts of the line from Manchester Victoria via Miles Platting are closed for engineering work on the above dates
Does anyone know the limits of the block?
The services on the Calder Valley are terminating at either Rochdale or Moston with the stock off the Moston services reversing at Thorpes Bridge Jn and back to Moston.
There are a number of ECS moves from Newton Heath to Manchester Victoria in the timetable via Miles Platting and also Freight workings
The Liverpool to Drax service is showing the normal route via Philips Park West Jn and Brewery Jn SX but diverted on the Saturday 31st via Diggle
Just wondering how much of the railway is actually open
There is info in RTT but some services have not been amended
Thanks
Peter
Does anyone know the limits of the block?
The services on the Calder Valley are terminating at either Rochdale or Moston with the stock off the Moston services reversing at Thorpes Bridge Jn and back to Moston.
There are a number of ECS moves from Newton Heath to Manchester Victoria in the timetable via Miles Platting and also Freight workings
The Liverpool to Drax service is showing the normal route via Philips Park West Jn and Brewery Jn SX but diverted on the Saturday 31st via Diggle
Just wondering how much of the railway is actually open
There is info in RTT but some services have not been amended
Realtime Trains | Departures from Philips Park West Jn all day on 04/08/2021
Train information at Philips Park West Jn all day on 04/08/2021. From Realtime Trains, an independent source of train running info for Great Britain.
www.realtimetrains.co.uk
Thanks
Peter