    I note that from September, certain early morning and late evening trains along the North Wales Coast are scheduled to be substituted by RRBs on Mondays-Thursdays.

    Does anyone know if this is to give more time for engineering work, or a re-arrangement of signal-box opening hours, or is there any other reason?

    http://www.arrivatrainswales.co.uk/Timetables/
     
  2. PHILIPE

    PHILIPE Established Member

    Messages:
    7,152
    Joined:
    14 Nov 2011
    Location:
    Caerphilly
    Engineering Work. This sort of this arrangement is nothing new and frequently happens for periods of a Timetable.
     
  3. LNW-GW Joint

    LNW-GW Joint Established Member

    Messages:
    10,168
    Joined:
    22 Feb 2011
    Location:
    Mold, Clwyd
    Might be the start of the resignalling project (Rockliffe Hall-Llandudno).
    Usually the maintenance closures are during the winter months.
     
  4. Welshman

    Welshman Established Member

    Messages:
    2,487
    Joined:
    11 Mar 2010
    That makes sense, as it's the section from Llandudno Junction eastwards which is affected.
     