I was reading another forum and someone posted a link to this report by TfL: http://www.sutton.gov.uk/CHttpHandler.ashx?id=16498 (hosted by Sutton Borough for whatever reason.)
On p.110, under paras 16 and 21, it says there is a conceptual scheme to reconfigure both sides of Victoria to create additional platforms for Southern and Southeastern services. It links the reconfiguration of the Southeastern side to the grade separation of Herne Hill's junctions on the Chatham line, as presumably there would be no point doing one without the other since both are at capacity. The timescale is 'post-2020'.
Does anyone know more about the plans? Google hasn't turned up much.
On p.110, under paras 16 and 21, it says there is a conceptual scheme to reconfigure both sides of Victoria to create additional platforms for Southern and Southeastern services. It links the reconfiguration of the Southeastern side to the grade separation of Herne Hill's junctions on the Chatham line, as presumably there would be no point doing one without the other since both are at capacity. The timescale is 'post-2020'.
Does anyone know more about the plans? Google hasn't turned up much.