adamedwards
Member
- Joined
- 4 Apr 2016
- Messages
- 796
Masts are going in at New Barnet on the down slow, I assume to replace those in the platform. Is this to ensure correct sight lines for 8 car trains, which currently aren't allowed to stop there?
Or it there something to do with Thamslink?
Thanks
Adam
Or it there something to do with Thamslink?
Thanks
Adam