New Barnet (ECML) - new electrification works

Status
Not open for further replies.

adamedwards

Member
Joined
4 Apr 2016
Messages
493
Location
Hatfield, Herts
Masts are going in at New Barnet on the down slow, I assume to replace those in the platform. Is this to ensure correct sight lines for 8 car trains, which currently aren't allowed to stop there?

Or it there something to do with Thamslink?

Thanks

Adam
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

petersi

Member
Joined
24 Apr 2012
Messages
438
There seem to be new masts from Hadley wood tunnel to the station look like cantilever rather than head span
 