No trains on the WCML at Weedon today (03/05)

Status
Not open for further replies.

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,234
Two weeks leads up nicely to the 18th of May which is when some TOCs could be reintroducing a Saturday timetable. Plus you have a Bank Holiday this Friday when engineering works would be more commonplace anyway.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Boodiggy

Member
Joined
8 Nov 2012
Messages
534
Location
MK
There were plenty of extended closures for WCRM. All lines for a week in August(s), at least twice, somewhere south of Rugby.

It won’t be 125, partly because of the air pressure issue, and partly because Kilsby has very difficult geology (seams of running sand) and keeping the track fit for 125mph would be a significant challenge.



It’s not so long ago that midweek daytime trains had extra time in the schedules for a slow line weave to allow for maintenance on the fasts. Unthinkable now.




Re the other tunnels, the Pendolinos are pressure sealed, so can operate at the higher speeds without passenger comfort issues. The pressure relief shafts were there to limit the impact of a Pendolino passing other types of train in the tunnels, most notably curtain sided swap bodies (eg the Tesco train) where the vehicles could have been damaged. Specific tunnels:

Linslade is sufficiently short that it didn’t need pressure relief shafts (and the down fast is single bore so wouldn’t need them anyway)

Northchurch: the early feasibility used some old maps, only later was it realised that a new housing estate had been built on the land above the tunnel. The top of the shaft can be seen clearly on google maps.

Stowe Hill: already had plenty of ventilation shafts, but not quite good enough aerodynamically; IIRC additional audits were mined between the tunnel side walls and the existing shafts.

it was as recent as 2007/2008 there was the day time line blocks between Hanslope - Milton Keynes and Tring - Ledburn for the daylight patrolling. I remember it well.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,216
In Scotland at least the banks were still closed today and the engineering would have been planned for this weekend. The last minute shift of the Public holiday to Friday occurred long after NR -s work plan's would have been finalised, so I doubt there's much next weekend.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,176
In Scotland at least the banks were still closed today and the engineering would have been planned for this weekend. The last minute shift of the Public holiday to Friday occurred long after NR -s work plan's would have been finalised, so I doubt there's much next weekend.

There is, lots! It meant a fair amount of replanning, but fortunately this was almost all on the NR side, as the operators hadn’t started any detailed planning for service alterations when the change came through a year ago.
 

Hb06_

Member
Joined
27 Mar 2020
Messages
174
Location
Northampton
Does anyone know which alternative line AWC are using? Is it the line London Northwestern run on?
 