There appear to be at least three pairs of 331s booked to work Hazel Grove/Blackpool North/Manchester Airport diagrams from next week, according to the traincrew diagrams.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,225
There appear to be at least three pairs of 331s booked to work Hazel Grove/Blackpool North/Manchester Airport diagrams from next week, according to the traincrew diagrams.

That's good news that they're meant to be in pairs.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
What's booked and what actually happens with traction on Northern are two very different things, and seeing as though they are still booked about 50 minutes layover at Hazel Grove and it's already been proved that that's not workable, we'll see what happens on Monday.
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,298
That's good news that they're meant to be in pairs.
Indeed, finally confirmation of the capacity increasing to pre-electrification levels for the Manchester - Blackpool section! (in the form of 138m of carriages like the double 185s used to be)
What's booked and what actually happens with traction on Northern are two very different things, and seeing as though they are still booked about 50 minutes layover at Hazel Grove and it's already been proved that that's not workable, we'll see what happens on Monday.
Should be ok for the Airport services?
It looks possible for the Hazel Groves to go to platform 0 at Stockport for half an hour?
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Indeed, finally confirmation of the capacity increasing to pre-electrification levels for the Manchester - Blackpool section! (in the form of 138m of carriages like the double 185s used to be)

Should be ok for the Airport services?
It looks possible for the Hazel Groves to go to platform 0 at Stockport for half an hour?
So long as the Airports don't share a platform, at the moment with the 319s I seem to remember always ending up in and out of unoccupied platform 1.

No chance of going back to platform zero at Stockport. Any move from the Hope Valley lines to platform zero would have to run up to Heaton Norris to reverse.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,266
Location
Greater Manchester
What's booked and what actually happens with traction on Northern are two very different things, and seeing as though they are still booked about 50 minutes layover at Hazel Grove and it's already been proved that that's not workable, we'll see what happens on Monday.
Might the plan be to split the pairs at Hazel Grove, and shunt one 3-car unit into each of the two sidings for the 50 minute layover? Then reassemble the formation in the other platform for the return working? The mind boggles...!
 

palmersears

Established Member
Joined
20 Sep 2011
Messages
1,485
Might the plan be to split the pairs at Hazel Grove, and shunt one 3-car unit into each of the two sidings for the 50 minute layover? Then reassemble the formation in the other platform for the return working? The mind boggles...!
Signalling at Hazel Grove doesn't allow permissive entry to platforms, so that's a no go.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Yep, see post #1263.

I can see that this has actually been overlooked, it nearly was with the 180s when they came in 2008 but luckily they did fit in the sidings once the overgrown vegetation had been cleared and it was found that there was actual track beneath the bushes.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,686
Location
west yorkshire
With the new timetable beckoning have any more 331s been taken out of store at edge hill. Last report on here a while back was 7x 3car there with 10 still awaited from CAF.
K
 
Last edited:

Bovverboy

Established Member
Joined
1 Dec 2013
Messages
1,933
With the new timetable beckoning have any more 331s been taken out of store at edge hill. Last report on here a while back was 7x 2car there with 10 still awaited from CAF.
K

Are you sure they weren't 195's?

Not sure but last months 507021 excellent blog lists 19 x 331/0 as delivered but not in use presumably at EG with 10 more awaited. Some are on training and more have entered service since then.
K

331/0s are 3-car, I think that's the confusion.
 

86247

Member
Joined
12 Feb 2017
Messages
306
Location
clock face
21 331/0 delivered with 10 outstanding.
17 195/0 delivered with 8 outstanding.
31 195/1 delivered with 3 outstanding, that's according to train logger.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,011
Indeed, finally confirmation of the capacity increasing to pre-electrification levels for the Manchester - Blackpool section! (in the form of 138m of carriages like the double 185s used to be)
I wouldn't hold your breath judging by the doubled up 195 services on the Liverpool to Manchester Airport route which are supposed to be 6 cars. Pot luck what turns up! Some days it can be 6, others it can be just 2.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,266
Location
Greater Manchester
Yep, see post #1263.

I can see that this has actually been overlooked, it nearly was with the 180s when they came in 2008 but luckily they did fit in the sidings once the overgrown vegetation had been cleared and it was found that there was actual track beneath the bushes.
Oops, sorry, I missed that post.

But is Northern management plumbing new depths of incompetence? I pointed out back in post #1167 that the Hazel Grove sidings are not long enough for 6-car formations - all it took to establish that was a few minutes spent scanning the Sectional Appendix on the Network Rail website. How can professional planners fail to carry out such a basic check?!
 

jizzer

Member
Joined
2 Feb 2012
Messages
51
Oops, sorry, I missed that post.

But is Northern management plumbing new depths of incompetence? I pointed out back in post #1167 that the Hazel Grove sidings are not long enough for 6-car formations - all it took to establish that was a few minutes spent scanning the Sectional Appendix on the Network Rail website. How can professional planners fail to carry out such a basic check?!

Hazel Grove sidings can take a 6 car 331. It has been measured. And most if not all Blackpool to Hazel Grove services will be 6 car 331s from Monday.
 

nigelsporne

Member
Joined
20 Dec 2012
Messages
91
331015 was stabled at Stockport today. Northern services a shambles today, not a good portent for tomorrow!
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Fairly sure 015 has been the training unit out of Stockport for a few weeks now.
 

Inox

Member
Joined
2 Jan 2011
Messages
137
onboard a 331 from buckshaw to airport. First time on a caf unit. Like them already.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Hazel Grove sidings can take a 6 car 331. It has been measured. And most if not all Blackpool to Hazel Grove services will be 6 car 331s from Monday.
Have the sidings been lengthened then? Otherwise they're way too short. 2* 3-car 331 is a shade short of 143m in length.
 

Amstel

Member
Joined
24 Jul 2018
Messages
31
I did see them cutting down vegetation near to the station about 6 weeks ago
and trains were using one line only in both directions to allow for this work to go on,
but I've no idea why (should have asked).
 

CJ

Member
Joined
18 May 2009
Messages
201
Location
Stockport
There was a 331 on the 12:25 Congleton to Stoke today.
I saw it pulling into Prestbury from my replacement bus (10:44 CNG-Manchester cancelled)
Hourly service please! Over 2 years late!
331015 is operating the Manchester - Stoke-on-Trent service(s).

Also 331112 operating Manchester Airport - Blackpool North as well.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,266
Location
Greater Manchester
Have the sidings been lengthened then? Otherwise they're way too short. 2* 3-car 331 is a shade short of 143m in length.
I have now measured the Hazel Grove sidings on a Google Maps satellite image, and it appears that the usable length is about 170m from the buffer stop to the exit signal.

My bad for believing the SA!
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
1,930
Location
Rochdale
A 6 car has been in there today I believe. I wonder if the SA was going on usable length rather than the official length?
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
I have now measured the Hazel Grove sidings on a Google Maps satellite image, and it appears that the usable length is about 170m from the buffer stop to the exit signal.

My bad for believing the SA!
Good effort, I tried doing that before and gave up after squinting at it for five minutes. Let's hope they run as booked tomorrow then, two three-car sets will go like absolute stink.
 

northernchris

Established Member
Joined
24 Jul 2011
Messages
1,509
Good effort, I tried doing that before and gave up after squinting at it for five minutes. Let's hope they run as booked tomorrow then, two three-car sets will go like absolute stink.

I use Great Northern's live departure tool as it seems to be accurate, and that's currently showing a Blackpool - Hazel Grove and a Blackpool - Airport as being 8 carriages!
 