Northern Class 331: Construction/Introduction Updates

Status
Not open for further replies.

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,241
Is this a good time for ECS and stock moves? Fine if all goes to plan (only one isolated driver required) but will breach social distancing in case of failures.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bovverboy

Established Member
Joined
1 Dec 2013
Messages
1,933
Last edited by a moderator:

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
There are plenty of short platforms on the routes the six-car 331s work at the moment between Blackpool and Hazel Grove.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,686
Location
west yorkshire
Are the six car platform extensions finished now?
They havent started any apart from glacial progress of platform zero at Leeds which is taking around 2 years.
A reminder that for SDO the terminating platforms like Leeds and Skipton must be full length.
K
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
2,864
Location
Liverpool, UK
57310 and 57305 took 331111 from Allerton to Skipton today. It is reported that all six 331/1 (331102/03/05/07/11/12) are being transferred east. I assume that they will be replaced on the west side by pairs of 331/0?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
11,457
What lead to the discussion that the 333/1s are going west, then?
 

Tractor37

Member
Joined
23 May 2017
Messages
241
Skipton, Keighley, Shipley (towards Bradford) that's pretty much it without using SDO

Shipley platform 5 (towards Bradford) can only just fit a 333 (4 car). The only platform long enough to fit a 6 car train is platform 3, used for trains heading towards Leeds and Ilkley from Bradford.
 

nigelsporne

Member
Joined
20 Dec 2012
Messages
91
With the current lockdown in force has this given Northern an opportunity to commission more 331s and 195s so that when things return to normal all units will be available? If this has been covered elsewhere sorry.
 

Gordonman

Member
Joined
14 Jan 2020
Messages
311
Location
Baildon
Shipley platform 5 (towards Bradford) can only just fit a 333 (4 car). The only platform long enough to fit a 6 car train is platform 3, used for trains heading towards Leeds and Ilkley from Bradford.

Platform 3 is also bi-directional - very handy in times of disruption
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
11,457
With the current lockdown in force has this given Northern an opportunity to commission more 331s and 195s so that when things return to normal all units will be available?

I imagine most TOCs are not allowing more than one person in a cab at a time, so commissioning may be a bit difficult.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,011
With the current lockdown in force has this given Northern an opportunity to commission more 331s and 195s so that when things return to normal all units will be available? If this has been covered elsewhere sorry.
I suspect there is no rush to introduce the last units and train remaining staff as there is no need. In reality there is going to be no massive "rush" back to using public transport once normality can resume in some capacity (probably July/August). Some companies will adopt a phased approach and many staff will carry on working from home until autumn. Additionally most services will be reintroduced but I reckon we will not return to a full working timetable (pre-March) until timetable change in December.
 

Roger B

Member
Joined
16 Jun 2018
Messages
896
Location
Gatley
A phased ramp-up to something approaching normality might provide opportunities for accepting more new trains and training more staff. Will need some careful planning though!
 

323 Class

Member
Joined
8 Apr 2019
Messages
238
Location
Hadfield, Glossop,Highpeak, Derbyshire

childwallblues

Established Member
Joined
3 Jul 2014
Messages
2,864
Location
Liverpool, UK
If the rumours of all four car sets going to Neville Hill comes off all the three car sets will be at Allerton and no six car sets will be running in Yorkshire.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,202
Isn't that a fairly big over subscription of units to the east? The 333s aren't going anywhere, and it's far more than the 321/322 fleet.
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
1,710
Location
West Yorkshire / Birmingham
If the rumours of all four car sets going to Neville Hill comes off all the three car sets will be at Allerton and no six car sets will be running in Yorkshire.
This arangement is likely to be temporary as Northern are probably waiting for platform 0 to be completed - There's no point in having a load of 331/0s sat around at Neville Hill and Skipton Broughton Road so they might as well put them to use somewhere - possibly in place of single 323 workings to accelerate the rate of 323 refurbishments and take some non PRM-compliant trains out of service.

Furthermore, double 331/0s have been tested around the 333's stomping ground and have visited all of the stations - See post #1611.
 
Last edited:

superkev

Established Member
Joined
1 Mar 2015
Messages
2,686
Location
west yorkshire
Have any more 4 car 331/1s moved east after was it 111 and 112. Presumably if the remaining 4 move over they can send the remaing 321 and 322s off lease.
Kev
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,801
Location
Yorkshire
Last edited:

Wharfe106

Member
Joined
25 Aug 2019
Messages
50
Location
Wharfedale
This arangement is likely to be temporary as Northern are probably waiting for platform 0 to be completed - There's no point in having a load of 331/0s sat around at Neville Hill and Skipton Broughton Road so they might as well put them to use somewhere - possibly in place of single 323 workings to accelerate the rate of 323 refurbishments and take some non PRM-compliant trains out of service.

Furthermore, double 331/0s have been tested around the 333's stomping ground and have visited all of the stations - See post #1611.
In this context it might be worthwhile re-iterating here that for some time now Network Rail's published completion date for platform zero and the associated track and signalling works, is December 2021, and given the virus situation, that is almost certain to slip till May 2022 at the least.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,686
Location
west yorkshire
IMG-20200406-WA0005.jpg
In this context it might be worthwhile re-iterating here that for some time now Network Rail's published completion date for platform zero and the associated track and signalling works, is December 2021, and given the virus situation, that is almost certain to slip till May 2022 at the least.
Network rails leeds improvement website shows Spring 2021.
I suspect it will current crisis permitting be tied into fitting a couple more points over Christmas. See pic taken a couple of days ago.
K
https://www.networkrail.co.uk/runni...tes/north-and-east/leeds-station-improvements.
 

Wharfe106

Member
Joined
25 Aug 2019
Messages
50
Location
Wharfedale
View attachment 76282
Network rails leeds improvement website shows Spring 2021.
I suspect it will current crisis permitting be tied into fitting a couple more points over Christmas. See pic taken a couple of days ago.
K
https://www.networkrail.co.uk/runni...tes/north-and-east/leeds-station-improvements.
Thanks for that link, most useful. The Network Rail October 2019 enhancements delivery plan says the whole project will be complete Dec 2021, but I am guessing that includes the rest of the project, not just Platform 0.

But that's going off topic, and there is a thread on Leeds Imps elsewhere.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
1,934
Location
Rochdale
Considering they had what 8? 321/322 and have been short of a 333 for a long time 12 4 car units in the east will be the first time in a long time they can comfortably run the service with out having to potentially put a DMU onto the jobs. It makes sense to concentrate the 3 cars and 4 cars on their respective areas. I believe some 6 car testing was done on the east though
 