Northern Class 331: Construction/Introduction Updates

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

pieguyrob

Member
Joined
27 Oct 2018
Messages
571
I have seen 331025, 026 and 028 at Blackpool North the last 2 days. 331105 is still in platform 1.
 

47550

Member
Joined
14 Jul 2017
Messages
176
Location
Manchester
There was a 331 working Piccadilly - Stoke yesterday. First time I have seen one working these services. It was the 1044 Piccadilly - Stoke and presumably other services on h this diagram. No idea which unit.
 

fishquinn

Established Member
Associate Staff
Quizmaster
Joined
4 Oct 2013
Messages
6,643
Location
Warwickshire
Apologies if I've missed it but what are the 331s actually working now and are they sharing routes with other classes (319s and 323s)? Thanks
 

Chorley Cake

Member
Joined
23 Aug 2014
Messages
296
Many of the western based 331/0 units act as pairs between Blackpool North and Hazel Grove or Liverpool Lime Street. More than half the fleet on those services.
 

fishquinn

Established Member
Associate Staff
Quizmaster
Joined
4 Oct 2013
Messages
6,643
Location
Warwickshire
Awesome thanks, haven't at all been keeping up to date with the new fleet introductions so thought it was just a couple in service til earlier for some reason :lol:
 

MDB1images

Member
Joined
9 Jun 2018
Messages
654
331030 noted today on CAF tests(presume fault free/mileage tests).

3Z12 08:00 Lancaster to Preston.
3Z13 09:49 Preston to Preston.
3Z14: 10:50 Preston to Preston.
3Z15: 11:52 Preston to Edge Hill C.S.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,682
Location
west yorkshire
331030 noted today on CAF tests(presume fault free/mileage tests).

3Z12 08:00 Lancaster to Preston.
3Z13 09:49 Preston to Preston.
3Z14: 10:50 Preston to Preston.
3Z15: 11:52 Preston to Edge Hill C.S.
Are the final deliveries, which I believe are 331 029 and 031 in the uk?
K
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,208
Are the final deliveries, which I believe are 331 029 and 031 in the uk?
K

Don't think so as these were confirmed much later than the first batch. I'd say 2021. There probably wouldn't be much demand for them prior to next year anyway as passenger numbers only slowly recover from COVID-19.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,208
First batch?
Are northern getting more 331s?

I'm sure 3 more were "gifted" to Northern as a way of compensation for delays in 2018/2019. It's these which likely won't have been built yet especially if the factories have had to close down for a while owing to COVID-19.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,162
Don't think so as these were confirmed much later than the first batch. I'd say 2021. There probably wouldn't be much demand for them prior to next year anyway as passenger numbers only slowly recover from COVID-19.
Are you getting confused with the three extra 195s (131-133?) ordered after electrification was cut back? I wasn’t aware of any changes to the 331 order.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,208
Are you getting confused with the three extra 195s (131-133?) ordered after electrification was cut back? I wasn’t aware of any changes to the 331 order.

Oh was that it? Happy to bow down to your superior knowledge. Have posted in the 195 thread 8-)
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,438
Location
The North
Good news about the extra cars. I’m very intrigued to know how many services in the north west can be formed of 6-cars regularly. Is it just going to be Blackpool-Hazel Grove and Liverpool-Crewe?
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,465
Location
Liverpool
Good news about the extra cars. I’m very intrigued to know how many services in the north west can be formed of 6-cars regularly. Is it just going to be Blackpool-Hazel Grove and Liverpool-Crewe?

Blackpool North - Manchester Airport was also regularly 6 cars before the COVID timetable, but not Liverpool - Crewe. There would have to be a lot of platform lengthening before this route could accommodate 6 cars. Liverpool - Blackpool can and does see 6 car (and even 7 car) working.

As I've said elsewhere, I strongly doubt any more than 17 of the 26 West Midlands 323s will move to Northern without a programme of platform lengthening across the North West, because at present there isn't enough work for the outstanding 9.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,438
Location
The North
Blackpool North - Manchester Airport was also regularly 6 cars before the COVID timetable, but not Liverpool - Crewe. There would have to be a lot of platform lengthening before this route could accommodate 6 cars. Liverpool - Blackpool can and does see 6 car (and even 7 car) working.

As I've said elsewhere, I strongly doubt any more than 17 of the 26 West Midlands 323s will move to Northern without a programme of platform lengthening across the North West, because at present there isn't enough work for the outstanding 9.

That wouldn’t stop SDO operation for 6 car 331s though.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,208
That wouldn’t stop SDO operation for 6 car 331s though.

There is a thread for double CAF workings under "Allocations, Diagrams and Timetables" :D I opened it up just before COVID-19 kicked in the West. In fact I'm about to post something in it now as it's lain dormant since the pandemic and the start of lockdown.
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,465
Location
Liverpool
That wouldn’t stop SDO operation for 6 car 331s though.

Far too many short platforms between Liverpool and Crewe to make 6 car operation practical even with DOO. Most can only accommodate 4 cars as far as I know. Then there is the question of demand: I'm not sure 6 cars are even needed on this route.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,438
Location
The North
Far too many short platforms between Liverpool and Crewe to make 6 car operation practical even with DOO. Most can only accommodate 4 cars as far as I know. Then there is the question of demand: I'm not sure 6 cars are even needed on this route.

I can only talk for Manchester-Crewe and Manchester to Alderley Edge services and 4 cars in the peak is not enough. They have been rammed and will be rammed post covid.

I would also expect that Liverpool-Manchester could realistically fill 6 cars.
 
Status
Not open for further replies.