Engineering works at euxton junction, wires probably turned off.A Hazel Grove to Buckshaw Parkway seemed to be formed of 2 3-car 195s on Monday but that might have been a one-off for the Bank Holiday.
Engineering works at euxton junction, wires probably turned off.
There wouldn’t be a mass isolation like that with services still running.
195’s deputising for 331’s trapped other side of the block. Back to 331’s again rest of the week.