    I downloaded the network rail timetable from their site, but I can't find the Leeds to Carlisle via the S&C timetable, it says Table 36. Anyone know where it might be, Thanks in advance
    Regards
    Mike
     
  2. philjo

    philjo Established Member

    Messages:
    2,251
    Joined:
    9 Jun 2009
    Last edited: 27 May 2015
  3. Mike99

    Mike99 Member

    Messages:
    117
    Joined:
    4 Mar 2011
    Location:
    Fareham
  4. 55018ballymoss

    55018ballymoss Member

    Messages:
    122
    Joined:
    21 Feb 2011
    I had the same problem Mike.

    Pleased I only downloaded it and had not purchased a hard copy - it is riddled with errors, even the index claims that Leeds-Carlisle is table 36. Is it the beginning of closure by stealth for the S&C again?
     
  5. Peter Mugridge

    Peter Mugridge Established Member

    Messages:
    8,280
    Joined:
    8 Apr 2010
    Location:
    Epsom
    No, it's just a small part of what appears to be the most error-ridden NRT ever.
     
  6. D6975

    D6975 Established Member

    Messages:
    1,962
    Joined:
    26 Nov 2009
    Location:
    Bristol
    Last edited: 28 May 2015
  7. berneyarms

    berneyarms Established Member

    Messages:
    1,501
    Joined:
    26 Nov 2013
    Please let's not get too melodramatic about this. The problem is that this NRT appears to have been a rushed job. Nothing more and nothing less.

    Several routes have changed table numbers (reflecting the changing operating patterns that routes have) but the station index and maps have not been updated.

    That's all that has happened.

    As above - there is a full list of tables on the Network Rail website:
    http://www.networkrail.co.uk/browse documents/eNRT/May15/Route_Index_and_Timetable_links.pdf?a=new
     
    Last edited: 31 May 2015
  8. Flying Snail

    Flying Snail Member

    Messages:
    701
    Joined:
    12 Dec 2006
    It is not melodramatic. The mixed up table numbers would be excusable if that were the only issue but it is not. A number of tables in it are so incorrect that they are unuseable.

    The TOCs managed to get their timetables out electronically and on paper, meanwhile the eNRT was very late and full of errors. It does appear there is a serious lack of anyone giving a damn about it any more.
     
  9. adrock1976

    adrock1976 Established Member

    Messages:
    1,531
    Joined:
    10 Dec 2013
    Location:
    Glasgow
    A question here - did the present day Table 36 (or 42 now) for the Leeds - Carlisle service ever appear in Table 53 (the Midland Main Line) as a continuation from Sheffield and Leeds City when there were direct services from London St Pancras to Glasgow and Edinburgh on Midland Railway metals?

    In peace

    Adam
     
    Last edited: 30 May 2015
  10. berneyarms

    berneyarms Established Member

    Messages:
    1,501
    Joined:
    26 Nov 2013
    I was referring to the statement that was made suggesting this was the beginning of the closure of the S & C by stealth. That WAS melodramatic or do you not think so?

    As to the state of the NRT - it is probably the worst we've seen in a long time. And I've been consistent in saying that it is a mess. That's a different issue though to the one I was commemting upon.
     
  11. 30907

    30907 Established Member

    Messages:
    4,174
    Joined:
    30 Sep 2012
    Location:
    North Lancs Loop
    The through services would have appeared in several tables. My 1958 timetable has London-Leeds and Leeds-Carlisle tables for the Midland route, and the NER timetable has a custom Sheffield-Skipton table. By 1968 the full service for Sheffield-Leeds was only in thé NER book, and that 3-way split persists.
     
  12. Flying Snail

    Flying Snail Member

    Messages:
    701
    Joined:
    12 Dec 2006
    Apologies berneyarms, I missed that part of his post. To be fair it is not melodramatic, it is utter nonsense. The crappy state of the NRT is a symptom of NR not caring about NRT nothing more, it has no connection to a supposed closure attempt on the S&C which is not going to happen.
     
  13. oldsiggie

    oldsiggie Member

    Messages:
    429
    Joined:
    24 Sep 2014
    Bit political here......but..... if you transfer the look and feel of the timetable, and transfer all that to the attitude of NR to it's Groundforce, then you can see whay there is unrest ! (from a person who works for NR and used to be proud to work for NR for over 30 years)
     