hammerwood
Member
- Joined
- 23 Sep 2011
- Messages
- 21
On my way back from London yesterday, I was early at London Bridge so decided to take an Uckfield train and change at Oxted (I was going to East Grinstead).
I noticed that platform 3 track at Oxted has been electrified - and am pretty convinced that this hasn't always been like that since the 1987 electrification.
Have I missed something?
If it is a reason addition (the kick boards look new) - what's the rationale behind doing it?
cheers!
I noticed that platform 3 track at Oxted has been electrified - and am pretty convinced that this hasn't always been like that since the 1987 electrification.
Have I missed something?
If it is a reason addition (the kick boards look new) - what's the rationale behind doing it?
cheers!