Just wondering when Paddington was wired why wasn't Platforms 1-4 wired?.
When Crossrail takes over line 6 for there turnback, Paddington will lose a line so it would make sense then to wire platforms 1-4.
And i can't imagine that FCC or Hex Ex or Heathrow connect will be happy at losing a line
When Crossrail takes over line 6 for there turnback, Paddington will lose a line so it would make sense then to wire platforms 1-4.
And i can't imagine that FCC or Hex Ex or Heathrow connect will be happy at losing a line