This weekend all down main line trains are running to slightly amended times and booked Slow Line from Fletton to Tallington.
I've just passed through the section on the 1730 ex KGX but the only signs of work are
- a scaffolding barrier between DS and DF at PBO
- a couple of JCBs sat idle in the space between the Stamford lines and the DF at Werrington.
Out of curiosity, is any work supposed to be going on?
(Note - Helpston to Syston is blocked, but that's a separate item)
Thanks in advsncd.
I've just passed through the section on the 1730 ex KGX but the only signs of work are
- a scaffolding barrier between DS and DF at PBO
- a couple of JCBs sat idle in the space between the Stamford lines and the DF at Werrington.
Out of curiosity, is any work supposed to be going on?
(Note - Helpston to Syston is blocked, but that's a separate item)
Thanks in advsncd.