Disruption on the Cambrian today, as the Welshpool to Sutton Bridge section was being worked by pilotman. OTT showed my train arriving at Welshpool, but didn't see it departing. About 3/4 hour late arriving at New Street, where it was terminated short.

What kind of fault could cause the loss of just one of the sections on an ETCS scheme? GSM-R failure at the Shrewsbury end?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

33017

Member
Joined
9 Sep 2017
Messages
273
Disruption on the Cambrian today, as the Welshpool to Sutton Bridge section was being worked by pilotman. OTT showed my train arriving at Welshpool, but didn't see it departing. About 3/4 hour late arriving at New Street, where it was terminated short.

What kind of fault could cause the loss of just one of the sections on an ETCS scheme? GSM-R failure at the Shrewsbury end?
An axle counter failure.
 