As the consultation opens tomorrow I would assume there will be much more detailed plans available then
Oh right. Suppose I have a duty for the rest of us then. As a local resident I should be privy to more info (fingers crossed).
And a quick google gets me to
a)
this from Croydon Council.
b) ...... and
this doc (dated 2011 but best I can do)
c) and
this from Network Rail
Notes for (b).
Page 7 sort of informative view.
Page 18 in b shows a green strip down the West side of the line (bottom of aerial photo) - so maybe I am wrong and that is a sloping cutting side waiting for a sixth track. I do recall though that the five tracks were enough and if there were only four tracks but each feeding two of the eight platforms then things would work better.
Page 20 brings back memories of how it looked in 1988. It was remarkably similar to the black and white photo. Reminds me - the ramps down to the platforms were there already and only had the roof replaced and the sides tarted up.
Page 22 indicates that the old platform 1&2 might not be being shoved North and so there must be space to be made under the concourse and George Street. Also shows nicely that the current/new bridge is bang in the middle of the platforms.
Page 46 nice plan f the current/new bridge.
Page 62 shows progression of platform changes and additions. Indictes numbering will be 1, 1a, 2, 2a, 3, 4, 5 & 6 WTF. It also infers 7 tracks from the South until the finish when it reverts to 6 !.