could someone tell me what is the planning process for either a Track Construction activity or a S&C Construction activity of each of these
  • Strategic planning process for engineering possessions
  • Planning of engineer’s trains and on track plant
  • Ordering and supply of materials
  • Manpower requirements
  • Road rail machines requirements
  • Possession arrangements
  • Hand over arrangement from maintainer to constructor
  • Engineers train and on track machine detailed plans
  • Ballast treatment (as appropriate)
  • Interface with other engineering functions
  • Isolation of Traction Supply (as appropriate)
  • Work Activity Plan (Gantt Chart)
  • Plain line Track Renewals
  • S&C Layout (detailing options for S&C build up methodology)
  • Risk Assessment
  • Disposal of waste materials
  • Opening of track to operational services
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
396
Location
Derby
Hi jaykelso,

I had started writing a comprehensive response from a track designer's perspective, having worked on numerous S&C renewals schemes - But it seems the draft didn't save!

I'll get back to you later this week with a few thoughts. Others can chip in too as numerous different teams and lots of man-hours goes into the planning and design for a renewal. (Might be why nobody's responded as there's no short answer)
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
13,337
Location
Bristol
This question seems to come up quite regularly:


I'm sure there is one thread that got the answer. I can't find it searching either the forums or google though. Maybe the mods could help dig it out and pin it?
 

jaykelso

New Member
Joined
8 Apr 2021
Messages
3
Location
durham
Hi jaykelso,

I had started writing a comprehensive response from a track designer's perspective, having worked on numerous S&C renewals schemes - But it seems the draft didn't save!

I'll get back to you later this week with a few thoughts. Others can chip in too as numerous different teams and lots of man-hours goes into the planning and design for a renewal. (Might be why nobody's responded as there's no short answer)
that would be great thanks. struggling to find some research on this one
 