Passed Hindley 5 mins late, most of it lost between Southport and Parbold.
Made up all the loss during the longer run from Kearsley to Salford Crescent under the wires.
Presuming that loss was due to train performance rather than signal checks or some other factor, routinely 5min late at Lostock Jn doesn't bode too well for a timetable that needs trains to hit their paths on the busy section through Bolton, where any knock-on delays will probably propagate into Castlefield.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,080
Current plan is all the Southport - Alderley Edge and just one diagram on Southport - Staly.
All subject to change a) under the shifting sands of the May timetable train plan (minus some new trains) and b) driver acceptance
The cab air conditioning issue (and non acceptance of the current driver's seat) seems to be no closer to being resolved. Today's test run should have happened last week but ASLEF refused to let any of its drivers be involved so had to be postponed to when a manager was available to drive it.
Passed Hindley 5 mins late, most of it lost between Southport and Parbold.
Made up all the loss during the longer run from Kearsley to Salford Crescent under the wires.
I wouldn't read to much into that, station dwell times would have been different to a normal passenger service as it's likely measurements would have taken place and possibly tests with the wheelchair ramps. There would of course of been no passengers to slow things down.
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,210
Are they planning any more test runs and driver training or are they still solving the seat and AC problems with ASLEF?
Seen one both yesterday and today running on diesel mode on WCML near Preston - too far away to see number.
 

DannyMich2018

Member
Joined
19 Dec 2018
Messages
732
The last training run was the other week and driven by a ROG driver.

Still no news on the cabs unfortunately.
Wonder if they will enter service this month, this year or ever!? Weren't they supposed to originally enter service in May 2018 three years ago? Seems ages ago since some were at the GCR Loughborough testing (Autumn 2018). How much testing do just 8 trains need? Going to Southport for a few days via Wigan in September so fingers crossed...
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,205
Wonder if they will enter service this month, this year or ever!? Weren't they supposed to originally enter service in May 2018 three years ago? Seems ages ago since some were at the GCR Loughborough testing (Autumn 2018). How much testing do just 8 trains need? Going to Southport for a few days via Wigan in September so fingers crossed...

Expect lots of 2-car services and complaints on Twitter if they're not in service Monday week. Just 3 of these can free up half a dozen diesels for strengthening elsewhere!
 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
5,630
Location
Croydon
Wonder if they will enter service this month, this year or ever!? Weren't they supposed to originally enter service in May 2018 three years ago? Seems ages ago since some were at the GCR Loughborough testing (Autumn 2018). How much testing do just 8 trains need? Going to Southport for a few days via Wigan in September so fingers crossed...
The 8 trains/units will need exactly the same amount of type testing as 800 units. I would hope we are beyond type testing so would then assume it is just acceptance testing of each unit. But maybe not. And, after all, the 800s have just encountered a problem of type - Aluminium vs welding !.
 

M60lad

Member
Joined
31 May 2011
Messages
852
Not to sure if it helps matters or not but on my way home last night I was actually quite surprised to see one of these units stabled up at Newton Heath Depot stabled up next to the new shed for the 195s so perfectly visable from St Mary's Road next to the petrol station.

I did think then what was it doing there but if considering their needed for service shortly I thought that there's no reason why it shouldn't be stabled at Newton Heath as virtually every other type of diesel unit gets stabled there.
 

AMD

Member
Joined
6 Dec 2017
Messages
603
It'll probably be at Newton Heath for training, as once up and running one will end up at NH each night.
 

Big George

Member
Joined
19 Dec 2020
Messages
13
Location
Pontypandy
Is anyone able to please tell me what is the procedure on 319/769s when disposing the unit, are the tail lights left on and remain lit?

How long before an LED tail light would drain the battery?
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
4,313
Latest list to the best of my knowledge:

NumberEx No.LiveryTOCDepot/LocationCurrent State
769002319002TfWTfWCardiff CantonIn Service
769003319003TfWTfWCardiff CantonIn Service
769006319006TfWTfWCardiff CantonIn Service
769007319007TfWTfWCardiff CantonIn Service
769008319008TfWTfWCardiff CantonIn Service
769421319421TfWTfWCardiff CantonUndergoing testing
769424319424NorthernNorthernAllertonUndergoing testing
769426319426Ex TL White & Blue DoorsTfWLoughborough WorksUndergoing conversion
769431319431NorthernNorthernAllertonConverted - awaiting testing
769434319434NorthernNorthernAllertonUndergoing testing
769442319442NorthernNorthernAllertonUndergoing testing
769445319445Ex TL White & Blue DoorsTfWCardiff CantonUndergoing testing
769448319448NorthernNorthernAllertonUndergoing testing
769450319450NorthernNorthernAllertonUndergoing testing
769452319452TfWTfWCardiff CantonIn Service
769456319456NorthernNorthernNorth WestUndergoing testing
769458319458NorthernNorthernCrewe Arriva TraincareUndergoing testing
769501319009Orion Dark & Light BlueROGLoughborough WorksUndergoing conversion
769502319010Orion Dark & Light BlueROGEastleigh WorksConversion to 769 complete - internal work ongoing
769503ROGConversion work yet to start
769504ROGConversion work yet to start
769505ROGConversion work yet to start
769506ROGConversion work yet to start
769507ROGConversion work yet to start
769508ROGConversion work yet to start
769509ROGConversion work yet to start
769510ROGConversion work yet to start
769922319422Ex TL White & Blue DoorsGWRWolverton WorksConversion work yet to start
769923319423GWR GreenGWRWolverton WorksConversion work yet to start
769925319425GWR GreenGWRNemesis Rail, BurtonConversion complete - stored, awaiting testing
769927319427Ex TL White & Blue DoorsGWRLoughborough WorksUndergoing conversion
769928319428GWR GreenGWRNemesis Rail, BurtonConverted - awaiting testing
769930319430GWR GreenGWRReading TraincareUndergoing acceptance exam
769932319432Ex TL White & Blue DoorsGWRLong MarstonConversion work yet to start
769935319435Ex TL White & Blue DoorsGWRLong MarstonConversion work yet to start
769936319436GWR GreenGWRLong MarstonConverted - awaiting testing
769937319437GWR GreenGWRWolverton WorksConverted - awaiting testing
769938319438Ex TL White & Blue DoorsGWRNemesis Rail, BurtonConverted - awaiting testing
769939319439Ex TL White & Blue DoorsGWRWolverton WorksConversion work yet to start
769940319440Ex TL White & Blue DoorsGWRWolverton WorksUndergoing conversion
769943319443GWR GreenGWRReading TraincareUndergoing testing
769944319444Ex TL White & Blue DoorsGWRDerby RTCConverted - now stored
769946319446GWR GreenGWRReading TraincareUndergoing testing
769947319447Ex TL White & Blue DoorsGWRWolverton WorksConversion work yet to start
769949319449GWR GreenGWRNemesis Rail, BurtonConversion complete - stored, awaiting testing
769959319459GWR GreenGWRNemesis Rail, BurtonConversion complete - stored, awaiting testing

Rows in bold are ones that have changed since I last posted :D
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Regarding the ten ROG 319s/769s, 319009 and 010 have been converted so far, but it seems very odd to have the last three digits as 501 and 502 respectively. The GWR ones seems to have kept the last two digits, with the preceding one changing to a 9 (the mighty Great Western Railway keeping with tradition by doing things their own way?).

Would it have been easier to have kept the existing last three digits? It seems renumbering for renumbering's sake, and one of the many reasons as how the country has ended up in the terrible state it is in nowadays.
 

Senna1210

Member
Joined
30 May 2019
Messages
93
769503ROGConversion work yet to start
769504ROGConversion work yet to start
769505ROGConversion work yet to start
769506ROGConversion work yet to start
769507ROGConversion work yet to start
769508ROGConversion work yet to start
769509ROGConversion work yet to start
769510ROGConversion work yet to start

Think its safe to say that these can be taken off the list
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,210
769503ROGConversion work yet to start
769504ROGConversion work yet to start
769505ROGConversion work yet to start
769506ROGConversion work yet to start
769507ROGConversion work yet to start
769508ROGConversion work yet to start
769509ROGConversion work yet to start
769510ROGConversion work yet to start

Think its safe to say that these can be taken off the list
Why? Have I missed some news about ROG?
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
4,313
769503ROGConversion work yet to start
769504ROGConversion work yet to start
769505ROGConversion work yet to start
769506ROGConversion work yet to start
769507ROGConversion work yet to start
769508ROGConversion work yet to start
769509ROGConversion work yet to start
769510ROGConversion work yet to start

Think its safe to say that these can be taken off the list

Why? Have I missed some news about ROG?
If you have, I have as well???
 

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,477
769503ROGConversion work yet to start
769504ROGConversion work yet to start
769505ROGConversion work yet to start
769506ROGConversion work yet to start
769507ROGConversion work yet to start
769508ROGConversion work yet to start
769509ROGConversion work yet to start
769510ROGConversion work yet to start

Think its safe to say that these can be taken off the list
That's rather cryptic, so it would be helpful to readers if you could elaborate what has changed.
 

Senna1210

Member
Joined
30 May 2019
Messages
93
With Brush at loughbrough shutting its doors very soon and only 1 unit left to do for rogs think its safe to say the other units will not be converted
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
1,623
Location
South Staffordshire
With Brush at loughbrough shutting its doors very soon and only 1 unit left to do for rogs think its safe to say the other units will not be converted

Really ? I thought Wabtec's class 769 work at Loughborough was to continue until the end of the current order. That is unless the line has been shipped to another works - maybe Doncaster ? Or unless ROG are having the work done on Leicester depot. That would be a good rumour wouidn't it !!!
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,159
With Brush at loughbrough shutting its doors very soon and only 1 unit left to do for rogs think its safe to say the other units will not be converted
Rubbish. Wabtec could do the work elsewhere (e.g. Doncaster).
 

Senna1210

Member
Joined
30 May 2019
Messages
93
Really ? I thought Wabtec's class 769 work at Loughborough was to continue until the end of the current order. That is unless the line has been shipped to another works - maybe Doncaster ? Or unless ROG are having the work done on Leicester depot. That would be a good rumour wouidn't
Thats the thing there are only 2 rogs units to convert of which the last one is on site as we speak

They could be converted elsewhere but the order would have to be placed for more units from rogs
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
6,639
Location
Northern England
I think I read that introduction on Northern is planned from the May TT change, is that still the case? If so are they starting from Sun 16th or Mon 17th?
 

AMD

Member
Joined
6 Dec 2017
Messages
603
I think I read that introduction on Northern is planned from the May TT change, is that still the case? If so are they starting from Sun 16th or Mon 17th?
Still up in the air, the company has a meeting with ASLEF about this tomorrow (Wed), so have to wait and see what comes out of it.........
 

geoffk

Established Member
Joined
4 Aug 2010
Messages
3,223
Still up in the air, the company has a meeting with ASLEF about this tomorrow (Wed), so have to wait and see what comes out of it.........
What problem does ASLEF have with the driver's seat? Isn't a 769 seat the same as a 319 seat? TfW managed to get its 769s into service in November. I know they are diesel only but I thought that the bi-mode conversion was the most problematic in terms of testing. Fewer drivers to train and only on one route?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,189
Location
St Albans
What problem does ASLEF have with the driver's seat? Isn't a 769 seat the same as a 319 seat? TfW managed to get its 769s into service in November. I know they are diesel only but I thought that the bi-mode conversion was the most problematic in terms of testing. Fewer drivers to train and only on one route?
The union are claiming that the trains are 'new' so should have a/c. It's just opportunism.
 