Stephen Lee
On Moderation
- Joined
- 7 Jul 2019
- Messages
- 680
As I have heard, Originally, during the peak of the station, 5 platforms were in service, 2 bay platforms, of which one survives and 3 through platforms, of which 2 survive. Despite that Platform 3 survived and was not removed like the old Platform 1 and Platform 5, service has been limited since 2008 when the Wellington-Walsall service was removed. I wondered what is the possible use of the platform? Say for an example, maybe a Wellington-Birmingham New Street service?