    Good evening all! Either the HST running the Inverness to London or London to Inverness service reportedly caught fire I think - someone said the engine went bang causing huge plumes of smoke.

    With any luck, 1 of the following 3 things...
    1. The maintenance team will fix the problem in hand !
    2. If VTEC have to, they'll borrow a HST from East Midlands Trains.
    3. They'll run a 225 on a HST diagram where possible and use the HST on a non-electrifed route.
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. cactustwirly

    cactustwirly Established Member

    Messages:
    2,752
    Joined:
    10 Apr 2013
    Oh the magic EMT HST tree is out again!
    Unlikely to borrow an EMT set tomorrow as most of the sets will be out.
    If an 8 car HST is replaced by a 5 car 222 then there will be uproar!
    Literally all the Sunday services are very busy already, because of the limited Sunday timetable.
    The 225 fleet is already stretched as it is.
    Tomorrow's chieftain will probably be cancelled, and VTEC may just be able to source an EMT HST for Monday, but the new timetable requires more HST sets so it isn't as easy as before for VTEC to hire a HST.
    But given that EMT treat their intercity passengers for granted, I wouldn't be surprised when rammed 222s are used when they hire the badly needed HST for an empty VTEC service.
     
  4. 43094

    43094 Member

    Messages:
    528
    Joined:
    19 May 2010
    1E13 INV - KGX Saturday morning - turbo problem with 43308 (no fire AFAIK).

    43285 being borrowed Sat + Sun from XC to cover.
     
  5. causton

    causton Established Member

    Messages:
    5,060
    Joined:
    4 Aug 2010
    Location:
    Somewhere between WY372 and MV7
    Tyrell/JourneyCheck says smoke but no fire, service went forward on one power car. Luckily with HSTs you can just ignore the broken/smouldering half and power on!
     
  6. route:oxford

    route:oxford Established Member

    Messages:
    4,595
    Joined:
    1 Nov 2008
    Power on? Limp on, or cancelled at Perth on the Northbound.
     
  7. Steamysandy

    Steamysandy Member

    Messages:
    123
    Joined:
    29 Jan 2018
    Location:
    Longniddry
    Transferring 125 maintenance from Craigentinny to Laura removes the option to change Power Cars in Edinburgh Waverley station as I've seen done in the past
     
  8. Highlandspring

    Highlandspring Member

    Messages:
    946
    Joined:
    14 Oct 2017
    Location:
    56°N
    1) VTEC/LNER will continue to maintain and repair HSTs at Craigentinny until the fleet is withdrawn. CrossCountry are transferring their HST maintenance away

    2) Powercar swaps in the Waverley haven’t been done for years, the station is far too busy now. It’s probably more than 10 years since I last saw one. If a powercar needs to be swapped due to a fault then the train terminates and the set is run off to Craigy.
     
    Last edited: 10 Jun 2018
  9. The North Briton

    The North Briton Member

    Messages:
    123
    Joined:
    28 Feb 2009
    As happened in this case, the set returned to service to work 1E21 1530 Edinburgh to Kings Cross with hired XC power car 43285 attached.
     
  10. gsnedders

    gsnedders Established Member

    Messages:
    1,080
    Joined:
    6 Sep 2015
    IIRC, they aren't allowed (with 9 cars) to run over Slochd on a single power car? (Or is it that they are, but only if they have a clear run for some long distance up to it?)
     
  11. Macwomble

    Macwomble Member

    Messages:
    173
    Joined:
    15 Dec 2016
    Location:
    Hamilton West
    Thought they weren't allowed beyond Blair Athol northbound on only one power car. Can't remember what, if any, "rule" there is for the southbound.
     
  12. gsnedders

    gsnedders Established Member

    Messages:
    1,080
    Joined:
    6 Sep 2015
    https://www.railforums.co.uk/threads/scotrail-hst-introduction-updates-discussion.137911/page-7 seems to give a bunch of detail from the Scotland SA. MTU powered HSTs, with fewer than ten(!) trailing vehicles and a single engine, in good railhead conditions are allowed all the way north/south on the HML on a single engine, but are required to have relatively long clear runs at the two major summits.
     
  13. Macwomble

    Macwomble Member

    Messages:
    173
    Joined:
    15 Dec 2016
    Location:
    Hamilton West
    That clears that up then.....thank you very much :D:D:D
     
  14. Highlandspring

    Highlandspring Member

    Messages:
    946
    Joined:
    14 Oct 2017
    Location:
    56°N
    That instruction has since been amended and resissued as part of the Scotrail HST introduction work.
     