Peter Sarf
Established Member
Last I saw it was passing Harrow and Wealdstone on 11/02/2025. That was a delivery run from York to Wembley via Edinburgh.What about 807005? In service yet?
Last I saw it was passing Harrow and Wealdstone on 11/02/2025. That was a delivery run from York to Wembley via Edinburgh.What about 807005? In service yet?
Only Avanti know when it will enter service.Has 807010 been fully wrapped in its Diversity/Race & Ethnicity livery? And when will it enter service
All I know is that further info will be coming soon and that it is a surprise. The train will be unveiled to the public around May I believe…Only Avanti know when it will enter service.
And only sources on here quote it as fully wrapped.
Until it’s publicised by Avanti no one officially knows.
Railway 200?All I know is that further info will be coming soon and that it is a surprise. The train will be unveiled to the public around May I believe…
Also, I’m wondering if 807009 will enter service alongside 807010.
No, it’s a diversity liveryRailway 200?
No, it’s a diversity livery apparently
See post #3503Railway 200?
So, I’m guessing that 807010 is complete now and awaiting static testing.807009 outside at Aycliffe on static testing.
807010 remains inside the test shed at Aycliffe, all staff have received email that no pictures of unit in its Diversity livery are to be shared.
Static testing will of started inside the test shed.So, I’m guessing that 807010 is complete now and awaiting static testing.
Oh, okay. So I’m guessing thatStatic testing will of started inside the test shed.
Looking at a comparison of Avanti Services at Liverpool in June to now, there are a number of additional services in the next timetable - i guess they'll be neededAll I know is that further info will be coming soon and that it is a surprise. The train will be unveiled to the public around May I believe…
Also, I’m wondering if 807009 will enter service alongside 807010.
They start testing them as a single car then as a complete unit.Oh, okay. So I’m guessing that
it’ll be tested at some point or that it’s already been tested unliveried.
Not necessarily, the XX:43 services are pathed as Class 80x which implies that the Class 807 Everos will work the XX:43 London Euston to Liverpool Line Street.Looking at a comparison of Avanti Services at Liverpool in June to now, there are a number of additional services in the next timetable - i guess they'll be needed
Yet the 06:43 LIV to EUS has been all PendolinosNot necessarily, the XX:43 services are pathed as Class 80x which implies that the Class 807 Everos will work the XX:43 London Euston to Liverpool Line Street.
The additional services which are the XX:02 services will be worked by Class 390 Pendolinos.
They have not accepted all the 807s so Wont have enough to do what they want with them.Yet the 06:43 LIV to EUS has been all Pendolinos
Then again, the 0643 is the non-stop (from Runcorn) to London EustonThey have not accepted all the 807s so Wont have enough to do what they want with them.
They’ll need the 807s though to displace the pendolinos currently running on the XX:43 to run the XX:02.Not necessarily, the XX:43 services are pathed as Class 80x which implies that the Class 807 Everos will work the XX:43 London Euston to Liverpool Line Street.
The additional services which are the XX:02 services will be worked by Class 390 Pendolinos.
The working times are already based on the MU profile.So when the MU speeds are finally implemented will the timings on 805/807 worked services be tightened up?
So when the MU speeds are finally implemented will the timings on 805/807 worked services be tightened up?
The working times are already based on the MU profile.
The latter 807009 and 807010 are yet to be accepted.They have not accepted all the 807s so Wont have enough to do what they want with them.
Could have implications for the May timetableThe latter 807009 and 807010 are yet to be accepted.
Yeah, possibly. This may imply that 807009 and 807010 may be rolled out during the May timetable changeCould have implications for the May timetable
The latter 807009 and 807010 are yet to be accepted.
The media launch is likely to be sometime this May/June but all is to be announced.009 I can’t see being that long before it is delivered to Avanti.
010 until Avanti do a media launch of it new livery the unit will not be accepted.
Will 807010 be out of the test shed soon then? Or will it remain in the test shed until Avanti do a media launch on it.009 I can’t see being that long before it is delivered to Avanti.
010 until Avanti do a media launch of it new livery the unit will not be accepted.
I think 805002 is yet to enter service.Nice - is that the last 805 to come into service or are there more?