43106
Member
I've just downloaded the PDF of the National Rail Timetable, and I've spotted something on the front sheet of it. NR are asking for "volunteers...to be involved in the draft and final editing stage of the National Rail Timetable production..."
By the looks of it, NR are asking for members of the public to do THEIR work AND not pay them. Desperation by NR, or am I (almost certainly) missing something?
By the looks of it, NR are asking for members of the public to do THEIR work AND not pay them. Desperation by NR, or am I (almost certainly) missing something?