All Line Rover
Established Member
- Joined
- 17 Feb 2011
- Messages
- 5,222
Yesterday (Sun 21 Feb 2016) had the fastest run I've seen in a long time, if ever, down the WCML: Warrington to Euston non-stop in 98 minutes (84 minutes between Crewe and Euston). It's exceedingly rare for a Manchester Pendolino to manage Euston to Crewe non-stop in 87 minutes. 86 minutes is unheard of. 84 minutes in the typically slower southbound direction and on a Sunday is very impressive. Has anything faster been achieved by a passenger service?
Screenshot attached from realtimetrains showing a breakdown of the journey.
Screenshot attached from realtimetrains showing a breakdown of the journey.