I started work at the BR(WR) signalling drawing office in Reading in 1983 and they were facing similar problems on the so called 'West of England' resignalling scheme incorporating the new Westbury and Exeter PSBs. Westbury construction was already too far advanced to change anything significant but the shears were out heavily on the Exeter scheme. They were too late for St Davids station thankfully, but I was shown the original plans that had been approved for Newton Abbot and Taunton. There was no possibility of retaining the original mechanical layouts at these sites so remodelling of some sort had to be carried out, but BR had been instructed by the treasury to make further substantial savings and thus engineers were tasked with reducing the number of new turnouts to be provided in the new layouts by approximately 50% compared to the totals originally planned. At Newton Abbot, a four platform layout proposed with outer through lines, some sidings and a double junction to the Torbay branch was heavily simplified to create the lobotomised three platform setup that survives today with its single lead connection to the branch. The layout struggled from day one and the situation steadily became worse with increasing traffic levels. Branch trains in particular often have to wait for a free platform today and connections are sometimes missed. I guess we were lucky the branch wasn't singled at the time too, but that was probably only because retaining double avoided additional points for an intermediate passing loop somewhere enroute! The layout at Taunton was also heavily simplified, with, for instance, the only exit eastbound from Fairwater yard being via the down platform loop, at the time the only platform available for all down passenger trains, despite there being two fast lines right through the station that actually had very little use at the time.