route:oxford
Established Member
- Joined
- 1 Nov 2008
- Messages
- 4,949
As I understand it, the work is due to commence soon, with the former Caledonian Railway Bridge closed for 3 months...
From the planning circular:-
http://www.stirling.gov.uk/__docume...planning-schedules/ps_wk46_11_november_30.pdf
11/00765
Replacement of existing bridge deck with a single span steel girder footbridge and minor re-grading to footway vertical alignment at Bridgend Footbridge Over Railway Line, Caledonian Place, Dunblane for Network Rail Buchanan House 58 Port Dundas Road Glasgow G4 0LQ
Hopefully it'll look just like the old one.
From the planning circular:-
http://www.stirling.gov.uk/__docume...planning-schedules/ps_wk46_11_november_30.pdf
11/00765
Replacement of existing bridge deck with a single span steel girder footbridge and minor re-grading to footway vertical alignment at Bridgend Footbridge Over Railway Line, Caledonian Place, Dunblane for Network Rail Buchanan House 58 Port Dundas Road Glasgow G4 0LQ
Hopefully it'll look just like the old one.