Schemes Happening in the North

Status
Not open for further replies.

Legolash2o

Member
Joined
27 Sep 2018
Messages
601
Hi,

What schemes are happening in the north at the moment please? Between Hull, Leeds, Manchester and Liverpool. Also Immingham and Doncaster. So far I have:
  • Transpennine Route Upgrade
  • York - Church Fenton
  • Leeds Platform 0
  • Lady Anne Level Crossing
  • Liverpool Lime Street - Edge Hill re-signalling
I'm pretty sure something is happening around Stalybridge and Miles Platting Jn as well but can't find any sources.

The reason I ask is because I'm mapping the Transpennine Route Upgrade and others in the area.

https://railmap.azurewebsites.net/Public/TRU
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
1,711
Location
West Yorkshire / Birmingham
Plans are advancing to redevelop Bradford Forster Square station, although I’m not sure that it will quite be to the extent shown in the concept art.

DELAYED plans to redevelop Forster Square Railway Station have taken a step forward today with the announcement by Bradford Council that a design and build contractor has been appointed.

The £17.3 million scheme to create a new station building, lift, and to create new shops and facilities in the station's unused arches was first announced several years ago - with a planned completion date of March 2021.

Bradford Council has now announced that Morgan Sindall Construction has been appointed to take the redevelopment forward and is expected to make a start on the new gateway to the city centre in early 2021.

Another one is the new Elland station, not sure when it will open though.
 
Last edited by a moderator:
Joined
24 Mar 2019
Messages
255
Location
The Canny Toon
Ground investigation work starting on Newcastle-Ashington line.

Exploratory work is getting under way for the proposed reintroduction of a passenger rail line in north-east England, 56 years after services ended.
Soil and rock samples are to be taken on the route of the Northumberland Line from Ashington to Newcastle to test ground conditions and check for mine workings.
Services could be running again by 2023 if the scheme is given the go-ahead.
 