Gwenllian2001
Member
I have read this report and it makes very interesting reading. Everything included in the Phase One proposals is now in hand. I have set out some of the Phase Two proposal in order of priority. It would be interesting to garner some comments on the proposals. I have deliberately left out Light Rail and service enhancements and only included New Works.
Priority Rank Number.
1. Beddau Cardiff, new rail line on disused rail corridor.
1. Rail to Urban Extension: NW Cardiff, Jc 33. (extension of Coryton Line).
5. Caerphilly Newport, new rail line on disused rail corridor.
10. Use of Cardiff Newport relief lines with new stations.
17. New station at Crumlin.
19. New station Upper Boat.
20. Electrified Llanhilleth Passing Loop, + 2 tph.
22. New Station, Caerleon.
23. Ystrad Mynach Bedlinog on freight line.
28. Abertillery Llanhilleth, new rail line on disused rail corridor.
36. Aberdare Hirwaun, with new station at Trecynon.
47. New Station, Crwys Road. (Cardiff)
51. New Station, Brackla.
Priority Rank Number.
1. Beddau Cardiff, new rail line on disused rail corridor.
1. Rail to Urban Extension: NW Cardiff, Jc 33. (extension of Coryton Line).
5. Caerphilly Newport, new rail line on disused rail corridor.
10. Use of Cardiff Newport relief lines with new stations.
17. New station at Crumlin.
19. New station Upper Boat.
20. Electrified Llanhilleth Passing Loop, + 2 tph.
22. New Station, Caerleon.
23. Ystrad Mynach Bedlinog on freight line.
28. Abertillery Llanhilleth, new rail line on disused rail corridor.
36. Aberdare Hirwaun, with new station at Trecynon.
47. New Station, Crwys Road. (Cardiff)
51. New Station, Brackla.