And do people who aren't enthusiasts really care?
They care about getting to their destination quickly and with the minimum of fuss.

If it was all in a tunnel they would be closer to doing so as construction on Phase 1 would have started years ago.

Would it? Tunnels still require the same planning consents, particularly:
-The impact of ventilation shafts/emergency tunnel access
-Tunnel construction/excavated material removal by road or rail
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Silent

Member
Joined
31 Mar 2016
Messages
38
Most railway lines these days are largely a monotony of tree covered trackside these days.
And 99% of passengers don't really care what is outside of their window these days.

I prefer continuous greenland to continuous tunnel anyday. Too much tunnel makes me feel a bit claustrophobic.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
Would it? Tunnels still require the same planning consents, particularly:
-The impact of ventilation shafts/emergency tunnel access
-Tunnel construction/excavated material removal by road or rail

Ventilation shafts for rail tunnels are considerably less impactful than those for road tunnels for obvious reasons, after all the air being ventilated is not heavily contaminated with various nasties produced by internal combustion engines.

Even then you can fit ventilation shaft tops inside a fake barn or similar buildings.
There would be effectively no blight near the tunnels or whatever - which would reduce the effective length of line that NIMBYs would complain about from the current length to a few kilometres total of tunnel breaks for fire access reasons.
Construction spoil would still be an issue but the terrain being moved through is hardly barren, there are canals and railways available for the transport of spoil if lorries are not acceptable for political reasons.
And spoil production is inherently more concentrated than in surface line construction and is thus easier to deal with without lorries.

Remove the NIMBYs and the project would have started construction by now.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,215
Ventilation shafts for rail tunnels are considerably less impactful than those for road tunnels for obvious reasons, after all the air being ventilated is not heavily contaminated with various nasties produced by internal combustion engines.

Even then you can fit ventilation shaft tops inside a fake barn or similar buildings.
There would be effectively no blight near the tunnels or whatever - which would reduce the effective length of line that NIMBYs would complain about from the current length to a few kilometres total of tunnel breaks for fire access reasons.
Construction spoil would still be an issue but the terrain being moved through is hardly barren, there are canals and railways available for the transport of spoil if lorries are not acceptable for political reasons.
And spoil production is inherently more concentrated than in surface line construction and is thus easier to deal with without lorries.

Remove the NIMBYs and the project would have started construction by now.

No, it *still requires exactly the same consents process to be gone through*. Ergo no quicker to get a Hybrid Bill.

And then take longer to build a tunnel once that's all gone through...
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
No, it *still requires exactly the same consents process to be gone through*. Ergo no quicker to get a Hybrid Bill.

And then take longer to build a tunnel once that's all gone through...

Would we be waiting for ridiculous numbers of NIMBY petitions to cycle through the consultation process and dealing with endless legal challenges by the likes of StopHS2? I doubt it.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
30,691
Location
Scotland
Would we be waiting for ridiculous numbers of NIMBY petitions to cycle through the consultation process and dealing with endless legal challenges by the likes of StopHS2? I doubt it.
Probably. They would just find something else to raise objections about. I'm guessing that damage to the water table would be high up the list.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
Probably. They would just find something else to raise objections about. I'm guessing that damage to the water table would be high up the list.

Thats a niche environmental complaint - that is nothing compared to the kind of difficulties made by people who will end up with HS2 within sight of their house ;)
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
20,382
Location
0035
No - it is simply personnel observations over large numbers of rail journeys.

I'm not so convinced myself, but if this was the case I'd imagine a large proportion of these customers will be requiring some sort of mobile connectivity, something which obviously by default is not available underground.

Given the lengths of tunnels and cuttings on HS2, are there proposals to install Wifi on board the trains that works underground, or install something in the tunnels that gives 4G/mobile phone reception?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
I'm not so convinced myself, but if this was the case I'd imagine a large proportion of these customers will be requiring some sort of mobile connectivity, something which obviously by default is not available underground.

Given the lengths of tunnels and cuttings on HS2, are there proposals to install Wifi on board the trains that works underground, or install something in the tunnels that gives 4G/mobile phone reception?

I don't suppose it's been decided yet, but as all trains on the network are supposed to have free wifi within a few years, no doubt HS2 will have whatever the current technology is at the time.

If the Channel Tunnel can have mobile access then I'm sure it's possible on the shorter and more accessible tunnels of HS2.
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
They would mostly be complaining about the construction sites and the amount of road traffic on them. Since many of the complaints are about that, I doubt you'd save much time.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
They would mostly be complaining about the construction sites and the amount of road traffic on them. Since many of the complaints are about that, I doubt you'd save much time.

With a tunnel there are only a handful of point construction sites, not one enormous long one.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
With a tunnel there are only a handful of point construction sites, not one enormous long one.

There is more road traffic though, because the amount of new material to come in and spoil to go out will be much greater. Even though a deep cutting will create more spoil than a tunnel of the same length, it is usually possible to move this only a short distance to use as fill for a nearby embankment.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,672
Location
Leeds
Even though a deep cutting will create more spoil than a tunnel of the same length, it is usually possible to move this only a short distance to use as fill for a nearby embankment.
Nowadays often including a pair of embankments forming a "false cutting" for environmental screening.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
There is more road traffic though, because the amount of new material to come in and spoil to go out will be much greater. Even though a deep cutting will create more spoil than a tunnel of the same length, it is usually possible to move this only a short distance to use as fill for a nearby embankment.

However careful selection of your TBM launching points allows the spoil to be moved out along a major transport artery - for example you woudl launch a TBM near an existing motorway junction or where railway access can be provided. This minimises the effect of the extra spoil moves even though much more tonne-kilometers is required to complete the task.

The chilterns are hardly an undeveloped desert after all.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,672
Location
Leeds
Yes but this discussion arose in the context of a suggestion to put the whole route in tunnel. The problem would then be many times greater.
 

The Decapod

Member
Joined
16 Aug 2010
Messages
236
Location
Everywhere
HS2 originally boasted 'futureproof' design for speeds of up to 250 mph. I don't know if that's still the case or whether it's been watered down. Given that the Channel Tunnel has a limit of about 100 mph for safety and operational reasons, any bits of HS2 that are in tunnels are likely to have a speed limit considerably less than the overall governing line speed. So the more of HS2 that's in tunnels, the longer the overall journey times.
 
Last edited:

MarkyT

Established Member
Joined
20 May 2012
Messages
6,232
Location
Torbay
HS2 originally boasted 'futureproof' design for speeds of up to 250 mph. I don't know if that's still the case or whether it's been watered down. Given that the Channel Tunnel has a limit of about 100 mph for safety and operational reasons, any bits of HS2 that are in tunnels are likely to have a speed limit considerably less than the overall governing line speed. So the more of HS2 that's in tunnels, the longer the overall journey times.

In the the Channel Tunnel example, speed of the fastest trains is limited primarily to maintain total capacity for the whole traffic mix, dominated as it is by the slower car and lorry shuttles. There is s similar policy in force in the new Alptransit tunnels in Switzerland, where passenger trains are not permitted to travel at their top speed along these very busy mixed traffic routes. While very high speed is possible in tunnels, cross sectional area of the bores has to be increased significantly to accomodate it. There's a trade off point at which the additional tunnelling costs outweigh the potential business benefit of further speed increases.
 

The Ham

Established Member
Joined
6 Jul 2012
Messages
10,282
In the the Channel Tunnel example, speed of the fastest trains is limited primarily to maintain total capacity for the whole traffic mix, dominated as it is by the slower car and lorry shuttles. There is s similar policy in force in the new Alptransit tunnels in Switzerland, where passenger trains are not permitted to travel at their top speed along these very busy mixed traffic routes. While very high speed is possible in tunnels, cross sectional area of the bores has to be increased significantly to accomodate it. There's a trade off point at which the additional tunnelling costs outweigh the potential business benefit of further speed increases.

I would also argue that with much of the HS2 tunneling being cut and cover the extra costs with a larger tunnel (required to allow the higher speeds) would mostly be associated with the removal of the extra soil and a small uplift in the tunnel section costs.

It also depends on if the trains run in a single large tunnel of two smaller tunnels. If a single tunnel, then for much of the time there wouldn't be a train heading in the opposite direction and so there is a lot of space for the air to get off the way, and even when there were two trains it would only have very limited impact on the speed of the trains and the associated air pressure.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
HS2 originally boasted 'futureproof' design for speeds of up to 250 mph. I don't know if that's still the case or whether it's been watered down. Given that the Channel Tunnel has a limit of about 100 mph for safety and operational reasons, any bits of HS2 that are in tunnels are likely to have a speed limit considerably less than the overall governing line speed. So the more of HS2 that's in tunnels, the longer the overall journey times.

The primary reason for the 100mph limit is to prevent the Eurostars being so much faster than the Shuttles that tunnel capacity falls through the floor as the Eurostars end up running on notional yellows behind them.

This does not really apply in HS2's case since the tunnels will be built largely for the ruling linespeed.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
Hyperloop has lower capacity, has not been shown to actually work and has numerous technical problems that each justify a thread of their own. If we were not going for standard guage high speed rail the next best choice would likely be either some form of maglev (like the Chūō Shinkansen technology) or something totally off the wall like a high speed Breitspurbahn.
 
Last edited:

DPWH

On Moderation
Joined
8 Sep 2016
Messages
244
I would also argue that with much of the HS2 tunneling being cut and cover the extra costs with a larger tunnel (required to allow the higher speeds) would mostly be associated with the removal of the extra soil and a small uplift in the tunnel section costs.

It also depends on if the trains run in a single large tunnel of two smaller tunnels. If a single tunnel, then for much of the time there wouldn't be a train heading in the opposite direction and so there is a lot of space for the air to get off the way, and even when there were two trains it would only have very limited impact on the speed of the trains and the associated air pressure.

Cut and cover tunnels are all fine and fair for flat land as found in cities built on floodplains, but most of the country isn't particularly flat, meaning that for a long distance line to going through hills would require very large cuttings to be infilled afterwards, or using methods other than cut-and-cover for construction, or somehow building a railway on an embankment, then building a bigger embankment to give sides to a "tunnel".

Meanwhile, those parts of the country that are flat tend to have water tables just below the lie of the land, so any cut and cover tunnel is going to get rather wet and probably require pumping.

Basically, the suggestion is entirely ridiculous. But then Donald Trump is president-elect, so who knows?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
Cut and cover tunnels are all fine and fair for flat land as found in cities built on floodplains, but most of the country isn't particularly flat, meaning that for a long distance line to going through hills would require very large cuttings to be infilled afterwards, or using methods other than cut-and-cover for construction, or somehow building a railway on an embankment, then building a bigger embankment to give sides to a "tunnel".

Earth moving is enormously cheap - so any location where there are no major disruption costs from the excavation and where the tunnel is less than something like a hundred metres deep will be cheaper to build using a cut and cover tunnel technique.

And it is worth noting that since HSR can tolerate major gradients you can follow the lie of the land - this is not a freight line that needs to remain flat. We can have indefinite gradients as steep or steeper than the Lickey.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
If you were to dig a cutting a 100m deep without putting in two huge and vastly expensive retaining walls first to hold up the sides during the excavations, to get a safe slope on the cutting sides while you work the cutting would be about a quarter of a mile across. That means moving about 34,000 tons of earth for each metre run of the cutting.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
If you were to dig a cutting a 100m deep without putting in two huge and vastly expensive retaining walls first to hold up the sides during the excavations, to get a safe slope on the cutting sides while you work the cutting would be about a quarter of a mile across. That means moving about 34,000 tons of earth for each metre run of the cutting.

And that doesn't actually cost that much any more - especially since long term spoil disposal is not an issue since almost all of it will go straight back into the hole afterwards. And at lower depths (since the tunnel is unlikely to be a continuous 100m below ground level) the amount of earth to be moved shrinks rather drastically.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
And that doesn't actually cost that much any more - especially since long term spoil disposal is not an issue since almost all of it will go straight back into the hole afterwards. And at lower depths (since the tunnel is unlikely to be a continuous 100m below ground level) the amount of earth to be moved shrinks rather drastically.

A surface railway is sometimes below and sometimes above grade, depending on the local topography. The design usually aims to balance the cuttings and embankments as far as possible, so the spoil from the cuttings roughly balances the amount needed for the embankments.

If it has to be in tunnel then by definition it can't go above grade, so where the ground goes from low to high, to stay underground in the low part it will be that much deeper underground in the high part so the amount of spoil to be removed and put back will be more than the amount to be removed (only) on a surface railway.

The entire length will also require concrete lining segments to be brought in, and after filling in the trench there will be spoil left over equivalent to the volume of the tunnel plus the lining. As there are no embankments to use this up, it will have to be disposed of off-route. All this will add up to maybe a dozen HGV movements in and out of the site for each metre of tunnel.

For this and other reasons, a cut and cover tunnel will involve far more disruption to the locals during construction than a normal surface railway would. There may be less noise and disruption after completion, but evidence from HS1 indicates that it's reasonably straightforward to mitigate the noise impacts of operational high speed trains.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
It doesn't necessarily have to be disposed of off site in open country.
You can just leave the ground level higher than it was before the tunnel was constructed.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
It doesn't necessarily have to be disposed of off site in open country.
You can just leave the ground level higher than it was before the tunnel was constructed.

Sort of giant linear molehill? Locals will love you for that!

Isn't the sole vague point of the idea to put the whole of HS2 in tunnel that it would leave the existing environment undisturbed?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,630
Sort of giant linear molehill? Locals will love you for that!

Isn't the sole vague point of the idea to put the whole of HS2 in tunnel that it would leave the existing environment undisturbed?

Considering the cutting is much wider than the tunnel segments dropped into the hole, and the tunnel cross section is inevitably much smaller than the cut is - the extra height is probably going to be rather small.

If the cutting really ends up 100m+ wide then a ~150 square metre tunnel ends up with a 'mole-hill' just over a metre tall.
It leaves the environment undisturbed in that a slight bump in the landscape will dissapear in short order.
 
Status