And even still, the signalers in these centres are certainly safety critical roles too.IECC Control Centres are still a very small part of the overall signaling control in this country.
Yes, I am one. Medically though we aren’t certified to PTS safety critical standard, whereas a signaller at a traditional trackside or track access to box are.