Many thanks Paul (above). Looks like the seats look pretty good. I just hope that they release design details for comment before signing any contracts in order to gauge public opinion.
I was hoping to demonstrate that the planned interior for the Tram-Train (in the briefing document is linked) provides as much (if not more) seating than other modern, world-class transport systems, and that expecting passengers to stand for short distances is not unique to the South Wales Metro system.Not impressed with what I see above. Some people will be making hour long journeys! It would be incredible if after all the hype that we end up with something that is worse than the present stock - apart from having air-conditioning and being electric.
A £135,000 study has commissioned, which will then inform a strategic outline business case.
The work will consider how much of the former route, which ceased operating more than 50 years ago, could be brought back and what would have to deviate from it.
Completely agree with you regarding the old railway track - also part of the is already been built on at Radyr Way ( a bit of a misnomer there is that it's not in Radyr! ).
Envoy - I believe that the non-Plasdwr development further up Llantrissant Road ( near Cregiau ) has links to Jct 33 so that would be the best way to get out onto the M4.
Completely agree with you regarding the old railway track - also part of the is already been built on at Radyr Way ( a bit of a misnomer there is that it's not in Radyr! ).
Unfortunately you have to be a student or staff member at Cardiff University to be able to watch it.
Perhaps an alternative not requiring demolition could branch off further north as illustrated. It would be a steep climb out of the valley but with LR vehicles that could be plausible. Might also fly over the city line and follow the abandoned formation to Llandaff to join the main line to Cathays and Queen Street.The houses that would need to be demolished to connect the re-built railway to the NW with the City Line are at the centre of this map:>
https://www.google.co.uk/maps/@51.4975271,-3.235392,388m/data=!3m1!1e3!5m1!1e1
Very true but you've still got got to create the junctions and transitions between existing and new routes. Street running, although possible clearly, should ideally be limited to a minimum, and on dedicated lanes or reservation and/or with absolute priority given to trams at junctions/crossings. The key benefits of LR capability are in the avoidance of complete segregation, steeper hill climbing and tighter curve negotiation capability, as well as the ability to have new road and pedestrian crossings at grade. The 50m long vehicles, capable of being run in double consists up to 100m length will be difficult to accomodate in many road layouts so some careful highway engineering will be involved in areas where space is shared with general traffic.Surely the whole point of having tram-trains was so that they could run on-street, with readily accessible stops? Clearly slows things down relative to 'proper' trains on dedicated rights of way, particularly if shared with other traffic, but does provide more options for routing within existing built-up areas.
Interesting map in the first image of this tweet from TFW from the Core Valleys job fair.
Appears to show future stations on a ‘spur’ from Cathays to National Museum and Greyfriars Road. Also a link between the Bay and Central via a Callagan Square station along with previously announced stations
that would be the yellow line from this map: https://en.wikipedia.org/wiki/South_Wales_Metro#/media/File:SW_Metro.png
Note the link from Cathays to Central that avoids Queen Street.
Also check out this document and the maps towards the end which show some options for on street running in the City Centre (including down High St/St Mary Street) and through Grnagetown.
https://tfw.gov.wales/sites/default/files/documents/SHRA South Wales Metro.pdf
It is. Any other on-street running is under 'future extension options', in other words, it's not funded or committed but is an idea for the future.Yes, seen the old Welsh Government published ideas/reports pre franchise being signed. However that map I’m alluding too is from a KeolisAmey event this week and one assumes is current as it was on display at the fair. I was under the impression the only confirmed on street running was the 200 or so meters in the bay?
This network will augment the new stations and services proposed as part of the South Wales Metro, exploit tram-train technology and make use of existing and new rail corridors. These rail-based interventions will be integrated with new bus priority corridors, a redesigned bus network and active travel measure to dramatically enhance public transport and active travel accessibility across the city.
I'd love to be on that proposed train when the on-board announcement says, "The next station is P+T C33 J33 P+R"
Looks like some kind of grade separation will be neccessary west of Cardiff to unlock capacity together with some extra platforms at Central station .Prof. Mark Barry has just had this published regarding the Metro:>
https://businessnewswales.com/emerging-vision-for-transport-in-cardiff/
The "Cardiff Circle" route in the link shows a stop at Herbert Street between Queen Street and Central, which is also on the Bay route. I think this means it would run on or near the street throught Callaghan Square with tram platforms near the south entrance of Central, so not requiring extra platforms in the existing station. But I agree probably grade separation to get from there to the City Line, which could incorporate a flying junction for the Penarth services.Looks like some kind of grade separation will be neccessary west of Cardiff to unlock capacity together with some extra platforms at Central station .
It could run at street level, but the road network round there is complex and busy, so all the junctions and conflicts might instead be avoided by a short elevated alignment as shown, about 750m long, and that could incorporate a Herbert St stop at the junction with the Queen St line. Is the undeveloped land shown immediately to the south of Callaghan Square still available? New buildings there might be built under and around such a viaduct.The "Cardiff Circle" route in the link shows a stop at Herbert Street between Queen Street and Central, which is also on the Bay route. I think this means it would run on or near the street throught Callaghan Square with tram platforms near the south entrance of Central, so not requiring extra platforms in the existing station. But I agree probably grade separation to get from there to the City Line, which could incorporate a flying junction for the Penarth services.
Notionally, there could be another chord to make a triangle at Herbert Street, creating additional capacity/flexibility between Central and Queen Street, if that was ever required. Perhaps passive provision and safeguarding might be appropriate for future expansion.I'm assuming you provide Northern access via a triangle junction through such an alignment?
The map I referred to above suggests the service would run to/from Queen Street rather than the Bay. Maybe therefore it would run further south past Callaghan Square so as to swing northwards and join the Bay line south of Herbert Street bridge. But assuming it's a tram-train it could include 25m curves if necessary.Notionally, there could be another chord to make a triangle at Herbert Street, creating additional capacity/flexibility between Central and Queen Street, if that was ever required. Perhaps passive provision and safeguarding might be appropriate for future expansion.
Developers PMG Limited and Persimmon Homes want to build on the site of Gwern y Domen in Rudry and have employed firm Asbri Planning to deal with the planning application to Caerphilly County Borough Council.