Evening all,
I am looking to catch a train to St Pancras International on Saturday 18/5/2013 at 0600am from Sittingbourne. I know there is normally one at 0607, which is 1F09. However, when I went to plan the journey online, this train did not show up in the timetable on thetrainline or Southeastern website, instead being advised to catch the 0637, which is 1F11.
Upon closer inspection on Realtime Trains, sure enough 1F09 does exist, as shown http://www.realtimetrains.co.uk/train/W42060/2013/05/18/advanced. Looking at this, it does say 'runs as required', what does this mean? Does this mean it might not run on that day? 1F11 does not say runs as required.
Thanks in advance.
I am looking to catch a train to St Pancras International on Saturday 18/5/2013 at 0600am from Sittingbourne. I know there is normally one at 0607, which is 1F09. However, when I went to plan the journey online, this train did not show up in the timetable on thetrainline or Southeastern website, instead being advised to catch the 0637, which is 1F11.
Upon closer inspection on Realtime Trains, sure enough 1F09 does exist, as shown http://www.realtimetrains.co.uk/train/W42060/2013/05/18/advanced. Looking at this, it does say 'runs as required', what does this mean? Does this mean it might not run on that day? 1F11 does not say runs as required.
Thanks in advance.