Just wondering what the future of the current Moorgate-Stevenage (via Welwyn & Hertford) are? For me this seems an excellent set of services to divert onto Crossrail 2/ Crossrail 3, so freeing up capacity on the ECML.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
27,630
Location
Redcar
Well seeing as neither the proposed Crossrail 2 or the asperational Crossrail 3 go anywhere near Moorgate - Stevenage I suspect the plan is for them to continue very much as they have previously.
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,008
Location
Leeds, West Yorkshire
Crossrail 2 goes to Kings Cross & Essex Road, easy enough to connect it. It's also connected to Thameslink, although personally I think the attempt to combine urban & long-distance services through the Thameslink core is going to be disastrous.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Diminishing the Finsbury Park-Moorgate to just 2tph then? Thameslink is already taking away half of its services - IIRC the Welwyn GC terminators are running through St Pancras et al.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
The proposed Welwyn services on the ECML > Thameslink are new. Moorgate will retain the same number of services as now. Also the Stevenage / Hertford > Moorgate services don't really affect ECML capacity, as they avoid the key pinchpoints (Welwyn viaduct / tunnels and Kings Cross)
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
The proposed Welwyn services on the ECML > Thameslink are new. Moorgate will retain the same number of services as now.

Really? That's great news if so (maybe we should just see how the whole thing progresses first :lol:). Thinking it through though the whole idea in the OP may be getting a little bit ahead of itself.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
Likely peak inner service spec is 10 off the Hertford Loop to Moorgate, and 6 from WGC, split 2 Moorgate, 2 to KX and 2 through Thameslink. Although this may change depending what the franchise bidders come up with.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
The only change I could see is one or two services terminating at Gordon Hill throughout the day as well as maybe a second service north of Hertford North throughout the day.

This would allow a metro turn up and go operation to be in place between Gordon Hill and Moorgate as well as improve the existing service between Stevenage and Hertford North.
 

ntg

Member
Joined
27 Sep 2010
Messages
123
Location
Potters Bar, Herts
Really? That's great news if so (maybe we should just see how the whole thing progresses first :lol:). Thinking it through though the whole idea in the OP may be getting a little bit ahead of itself.

Not necessarily, if the Crossrail 2 Regional Option is changed to allow a connection above ground at Ally Pally and used any spare capacity on the Hertford Loop, which is the only place it'd come anywhere near to Stevenage-Moorgate.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,372
Likely peak inner service spec is 10 off the Hertford Loop to Moorgate, and 6 from WGC, split 2 Moorgate, 2 to KX and 2 through Thameslink. Although this may change depending what the franchise bidders come up with.

However, the London and SE RUS (the most recent official scheme AFAICS) was quite clear on there being 4 tph from WGC to Thameslink, and 2 tph to Moorgate, giving a total of 12 tph into Moorgate with the 10 tph off the Hertford Loop.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
However, the London and SE RUS (the most recent official scheme AFAICS) was quite clear on there being 4 tph from WGC to Thameslink, and 2 tph to Moorgate, giving a total of 12 tph into Moorgate with the 10 tph off the Hertford Loop.

I was going off the timetable spec that will be in the new franchise. Although this will almost certainly change.
 