kevin_roche
Member
- Joined
- 26 Feb 2019
- Messages
- 930
I just found this document on the network rail website. https://www.networkrail.co.uk/wp-content/uploads/2021/07/South-West-Main-Line-Strategic-Study.pdf
I have not had time to read it all yet but I thought others might be interested in it too. I think it might send me to sleep over the next few days. The title page says:
And the executive summary starts:
I have not had time to read it all yet but I thought others might be interested in it too. I think it might send me to sleep over the next few days. The title page says:
South West Main Line Strategic Study Phase 1 2021
And the executive summary starts:
This SWML Strategic Study – Phase One has been undertaken between April 2020 and March
2021 to refresh the Main Line strategy between Woking and Waterloo, which originally formed
part of the Wessex Route Study (2015). The study considers:
• The current capability of the network;
• Future passenger demand scenarios;
• A road map of interventions to increase capacity on the SWML to respond to future
demand.