swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 31,409
Fareham at least was badly installed, IMHO. The stair treads seemed to be poorly fitted rubbish on the day it opened, I don’t think they survived the first winter, and adequate repairs have never been made.Fratton and Fareham both getting the same treatment with funds released from NR, let to believe it was a combination of gritting salt, and the south coast salty air corroding the steps. Hopefully the new surface they receive will be a long term fix considering the bridge is only about 10 years old.
At the same time though, it’s very rare to see these footbridges ever being thoroughly cleaned.