I saw there is a T3 posession at Chester on the Merseyrail platform and the adjacent siding where Ariva normal stable their 175s

Can anybody tell me what they are doing there please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,649
Location
Mold, Clwyd
On Monday they had started rebuilding the platform edge, having removed all the very large coping stones at the western end.
I couldn't tell if it involved raising the platform height as well (which is very low by national standards, as are all the other platforms).
 

sw1ller

Established Member
Joined
4 Jan 2013
Messages
1,567
ARRIVA!! how dare you! :lol:

as above, they’ve started work on raising the platform edge for the new step free access of 777 units.

some of you may recall they did this last year, but they ordered the wrong size stones so had to put all the old ones back in. Had the right stones been ordered in the first place, there’d be no possession on right now.
 
Joined
31 Aug 2019
Messages
341
Location
IW
I see...
I did wonder as I remember the work last year too but couldnt for the life of me remember what they did then either...

Yeah the platform always has been stupidly low at Chester. Its quite a struggle for some people.

So its only to rebuild the Merseryrail platforms then...
Nothing going on with the sidings opposite?
 

Y Ddraig Coch

Established Member
Joined
1 Nov 2013
Messages
1,298
I see...
I did wonder as I remember the work last year too but couldnt for the life of me remember what they did then either...

Yeah the platform always has been stupidly low at Chester. Its quite a struggle for some people.

So its only to rebuild the Merseryrail platforms then...
Nothing going on with the sidings opposite?

A couple of the closest sidings are probably under possession so they can work on the track or have equipment needed stabled there. Just a guess
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,649
Location
Mold, Clwyd
P7a at Chester has reopened.
It looks no different to what it looked like before, but possibly with a better edge.
No change in the very low height at all.
The 777s will have to be very clever trains to give level boarding.
 
Joined
31 Aug 2019
Messages
341
Location
IW
Yeah I saw they have given up the possession this morning...
They seemed to have moved work onto Ellesmere port last night but its all packed up now too.

Its been a long time since i boarded a train at Chester but I seem to remember it was quite a step up to a 507/508. I cant imagine they are looking at raising half a platform... they would have to add a step or ramp to make it a different level to platforms 4, 5, 6, and 7A...
Do Merseyrail ever use 7A? I cant remember. I dont think they did.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,649
Location
Mold, Clwyd
Yeah I saw they have given up the possession this morning...
They seemed to have moved work onto Ellesmere port last night but its all packed up now too.

Its been a long time since i boarded a train at Chester but I seem to remember it was quite a step up to a 507/508. I cant imagine they are looking at raising half a platform... they would have to add a step or ramp to make it a different level to platforms 4, 5, 6, and 7A...
Do Merseyrail ever use 7A? I cant remember. I dont think they did.

Yes I've got my a and b mixed up - it's 7b which is the normal Merseyrail platform and which has been re-edged.
The 3rd rail actually continues virtually the full length of P7, and Merseyrail do bring 6-car sets in in the peaks.