PHILIPE
Veteran Member
There comes a point that the 769 delays are down to the TOC not getting the training on them done (for whatever reason) rather than non-availability of the trains. At that point if TfW still want the 153s then Porterbrook should be charging them for the privilege.
Training has been delayed by COVID but TFW have made great strides in setting up bubbles for tutors and pupils. The 153s were offered by Porterbrook to compensate as they were running the 769 project. This was unlike the case of the 230s where there are 2 awaiting but the Depot (Chester) has been hit by staff isolating and unable to release for training and a shortage of Instructors due to unable to pass them out.
Last edited: