Signalling problems at City causing massive disruption through the morning peak.

Trains delayed by 2 hours +

Related to weekend works?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

philjo

Established Member
Joined
9 Jun 2009
Messages
2,884
ON FCC website:
Line problem: at City Thameslink.
Owing to signalling problems at City Thameslink trains have to run at reduced speed on southbound lines.
Impact:
Train services running through this station may be cancelled or delayed at short notice. An estimate for the resumption of normal services will be provided as soon as the problem has been fully assessed.
Customer Advice:
FCC tickets will be accepted on bus routes 620,621,330 from St Albans to Hatfield.
A shuttle train service will operate between Hayward's Heath and Brighton until further notice.
East Midlands Trains and Southern services are conveying passengers via any reasonable route until further notice. Arrangements have been made for First Capital Connect (TL) rail tickets to be accepted for these journeys.
Additional Information:
Due signalling problem at City Thameslink southbound trains are having to run at reduced speed, some delays of up to 90 minutes are occurring. FCC tickets will be accepted on the London Underground, and FCC Great Northern route, until further notice.
Message Received :07/11/2011 12:12
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Signalling problems at City causing massive disruption through the morning peak.

Trains delayed by 2 hours +

Related to weekend works?

Not at all, it's signalling problems affecting Southbound services only with these services running at reduced speed.
 

rmt-driver

Member
Joined
21 Dec 2010
Messages
289
Not at all, it's signalling problems affecting Southbound services only with these services running at reduced speed.

That is some reduced speed to be two hours late... 10 mph all the way from Bedford to Brighton ????
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
7,768
Location
Herts
Tell me about it - baled out at Mill Hill and caught bus to Northern line - 3 hours door to door in reaction. Almost a record for a delay in my 20+ years of commuting. Slow lines were a lineear parking spot for 319's.
 

ushawk

Established Member
Joined
5 Nov 2010
Messages
1,965
Location
Eastbourne
The 08.40 Bedford to Brighton was due into Brighton at 10.55 - due in at 13.43 - 2 hours and 49 minutes late. All FCC trains from Bedford arriving into Brighton are all well over an hour late so this must be a pretty bad problem.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
7,768
Location
Herts
2 signals stuck at red at C TLK , - 14 trains in a line at 0840 back to St Albans - some Sutton services over 2 hrs late .........
 

Furrball

Member
Joined
9 May 2011
Messages
561
Heavy knock on delays into the evening rush hour - lack of stopping trains now seems to be an issue looking at tweets from waiting passengers.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
Been caught up in this all day. Way into London was advised to use Hitchin (bit of a trek when I've just come from that direction) but drove in with a relative.

There are a few trains running from St Pancras International low level and this is what I have caught on my return. It's a start. South of St Pancras International there is no service till further notice posters.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
That is some reduced speed to be two hours late... 10 mph all the way from Bedford to Brighton ????

Nah, 5mph with wheelskates :lol:

To be honest, I'm not surprised at the delays - just think this will be a regular thing when GN services run though to Thameslink destinations in 2015+.......
 

TheJRB

Established Member
Joined
14 Feb 2011
Messages
1,207
Location
Ashford, Kent
According to NRE, 1E95 16:36 Bedford to Ashford International appears to be calling at all stations on the Catford loop line and will be diverted after Otford via the Bat & Ball line and will call additionally at Paddock Wood before running fast to Ashford.

Has the signalling problem been resolved?
 

RJ

Established Member
Joined
25 Jun 2005
Messages
8,383
Location
Back office
Oh dear, I had hoped to catch the 10:54 from Denmark Hill to St Pancras this morning which was cancelled. Ended up missing my EMT train and being delayed by an hour!
 

STEVIEBOY1

Established Member
Joined
31 Jul 2010
Messages
4,003
Nah, 5mph with wheelskates :lol:

when GN services run though to Thameslink destinations in 2015+.......

When GN do also run south, will there be 2 more platforms bought into use at ST. P. low level?, I know in the orig plans there were supposed to be 4 platforms when thinking ahead for the future, not sure if they finally got the go ahead though. If not it will be a squeeze. I also heard that Wimbledon/Sutton trains won't go further north than Blackfriars or City T/L, which is daft as that will mean they won't even go to ST.P with all the interchange facilities there. They could at least go a little further north.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
When GN do also run south, will there be 2 more platforms bought into use at ST. P. low level?, I know in the orig plans there were supposed to be 4 platforms when thinking ahead for the future, not sure if they finally got the go ahead though. If not it will be a squeeze. I also heard that Wimbledon/Sutton trains won't go further north than Blackfriars or City T/L, which is daft as that will mean they won't even go to ST.P with all the interchange facilities there. They could at least go a little further north.

AFAIK it will remain 2 platforms. And I'll be honest, I think it's ridiculous. Even with the current level of service one delay has a big knock on effect.
 

williamn

Member
Joined
22 May 2008
Messages
1,123
I dont understand why on earth this was causing such huge problems 7 hours on. I wanted to take a picture of the messages on the (useless) departure board at St Pancras which said something like 'This train is probably running but it's not been confirmed' Helpful.
 

Firestarter

Member
Joined
15 Sep 2009
Messages
542
AFAIK it will remain 2 platforms. And I'll be honest, I think it's ridiculous. Even with the current level of service one delay has a big knock on effect.

Is it even physical possible to to build a further two platforms?
 

Firestarter

Member
Joined
15 Sep 2009
Messages
542
When GN do also run south, will there be 2 more platforms bought into use at ST. P. low level?, I know in the orig plans there were supposed to be 4 platforms when thinking ahead for the future, not sure if they finally got the go ahead though. If not it will be a squeeze. I also heard that Wimbledon/Sutton trains won't go further north than Blackfriars or City T/L, which is daft as that will mean they won't even go to ST.P with all the interchange facilities there. They could at least go a little further north.

Is there anywhere online to see the original plans?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,070
Comfortably the worst service management and recovery I've seen in nearly a decade of commuting on the route. Trains were still leaving Bedford (on time) after 0900 when trains were stood at almost every signal between Harpenden and Kentish Town.

All for a relatively simple track circuit failure caused by a (probable) installation error on the weekend's work.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
I wanted to take a picture of the messages on the (useless) departure board at St Pancras which said something like 'This train is probably running but it's not been confirmed' Helpful.
around midday the dispays above the barriers at St.P simply reported everything as 'delayed', though staff were advising sensible alternatives, though also claiming that services were expected to be runing in 20 or 30 minutes. 3 hours later at a ghostly and desolate Blackfriars, the Announcer was enthusing about services in 20 or 30 minutes.
But there was no one left to listen.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
7,768
Location
Herts
Some horrendous delays - was on 2E19 this morning - 0816 off SAC (late start reaction due wife being called out overnight for a home birth !) - stood over 60 mins at Elstree (not in platform) thank God the train was not overcrowded - some of the preceding fasts were rammed solid so those folk would have had a terrible stand. Eventually limped forward signal by painful signal - and knowing there were 11 in front (thanks to call made to friend with TRUST access) - baled out at Mill Hill and took a bus to Edgware then the Northern Line. A 3 hour journey.

Trains were running up to 125 late - some worse - this evening was carnage with the much delayed fasts often 4 cars as they were basically very late off peak trains coming up from Brighton. Horrendous crowding - I got the 1654 running nearly 60 late - a very slow 8 car with a massive crowd on board virtually all the way to St Albans. Worst seen for a very long time - though the TT was slowly being restored southbound at least.

All down to a failure at 0631 on VS1059 and VS1061 signals on the down Snow Hill lines.
 

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,194
Location
London
So glad I drove in to work today. Which is something I seem to be doing more and more often. So the question is should I renew next month ?
 

Lee_Again

Member
Joined
29 Sep 2007
Messages
646
Location
Stevenage
I've got loads of stuff downloaded from the Thameslink 2000 enquiries, there's no mention anywhere of a four platform layout at St Pancras LL.

There never was a plan to use 4 platforms. A major ommission IMHO. Just look at today. And all that backing up on to GN just north of Kings Cross all too soon.

That section between Kentish Town and Blackfriars, while excellent in theory, has no fall back plan for when things go wrong.

St Pancras wouldn't have to be much bigger to fit a third and fourth track down the sides. 2 extra faces and more importantly, somewhere to put failed trains.

Those sidings in Snow Hill, what would it take to make them passing loops?

Track Circuits....with the hugh costs involved and the potential knock-on effects when it goes wrong (all too often) surely it would be cheaper and more reliable to use human signals. Surely 20 guys with walkie talkies or even shouting at each other would be more reliable and cheaper.
 