It is noticed that the last Thameslink train passes through London Bridge at 2335, and then no more.
However, the last train from London Bridge to East Croydon is at 0035, while the last Southeastern train passes through London Bridge at about 00:10 during weekdays and 01:00 during weekends.
Is there any reason why the 24-hour Thameslink services don't call at London Bridge when the station is still opening, given that London Bridge is a key hub for transiting from the two airports (Luton and Gatwick) to south-east London?
However, the last train from London Bridge to East Croydon is at 0035, while the last Southeastern train passes through London Bridge at about 00:10 during weekdays and 01:00 during weekends.
Is there any reason why the 24-hour Thameslink services don't call at London Bridge when the station is still opening, given that London Bridge is a key hub for transiting from the two airports (Luton and Gatwick) to south-east London?
Last edited by a moderator: