    Does anyone know what the third platform under construction in Staines station is for? Will Staines become a terminal station for any route?
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. Pumbaa

    Pumbaa Established Member

    Messages:
    4,863
    Joined:
    19 Feb 2008
    Airlink scheme at a guess.
     
  4. Matt Taylor

    Matt Taylor Established Member

    Messages:
    2,253
    Joined:
    31 Aug 2008
    Location:
    Portsmouth
    I'm not aware of any new platform being built at Staines, are you sure it isn't just the Up platform being lengthened?
     
  5. hawaii2468

    hawaii2468 Member

    Messages:
    103
    Joined:
    3 Jun 2011
    Could be. But it also looks like new tracks are being built the other side of the platform.
     
  6. ajax103

    ajax103 Established Member

    Messages:
    4,277
    Joined:
    28 Apr 2009
    That's what I thought, a lot of the platforms in that area are being lengthened to take 10 car trains - could this work be just a part of it?
     
  7. Old Timer

    Old Timer Established Member

    Messages:
    3,704
    Joined:
    24 Aug 2009
    Location:
    On a plane somewhere at 35,000
    I was asked to look at this earlier this year by one of the major Infrastructure Contractors.

    It is all to do with the Wessex platform lengthening scheme wich covers a whole host of stations including Vauxhall, Guildford, Epsom, Twickenham, and a variety of others that I cannot remember now.

    Certainly there will be some considerable works at Guildford.
     
  8. hawaii2468

    hawaii2468 Member

    Messages:
    103
    Joined:
    3 Jun 2011
    Yes, I just found that it's for the 10 cars operation for the Widsor route. The airtrack project would build a new station at Staines called Staines high street. However this planned had been abandoned.
     
  9. ntg

    ntg Member

    Messages:
    123
    Joined:
    27 Sep 2010
    Location:
    Potters Bar, Herts
    There are some tracks remaining from the old bay platform/sidings/whatever it was where the car park on the north side of the track is, could this bee what you saw?

    You can see it here, partially obscured by vegetation as a continuation of the third track.
     
  10. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,890
    Joined:
    7 Apr 2010
    The final version of the Airtrack plan had already scrubbed the Staines High St new station (due to local objections) which would have been at the west of the new triangular junction, but it still included a third platfom at Staines station itself, for terminating Heathrow Express trains, which would have run through T5 and reversed at Staines. That part of the plan (as far as it affected Staines) included a west facing bay platform behind the current up platform, but no through road.
     
  11. Matt Taylor

    Matt Taylor Established Member

    Messages:
    2,253
    Joined:
    31 Aug 2008
    Location:
    Portsmouth
    This week's Weekly Operating Notice states that the bay platform at Staines has actually been shortened by 58 yards.
     
  12. ntg

    ntg Member

    Messages:
    123
    Joined:
    27 Sep 2010
    Location:
    Potters Bar, Herts
    Which bay platform would that be!?
     
  13. Matt Taylor

    Matt Taylor Established Member

    Messages:
    2,253
    Joined:
    31 Aug 2008
    Location:
    Portsmouth
    It's the East Siding, which backs onto the platform.;)
     
  14. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,890
    Joined:
    7 Apr 2010
    Has the new footbridge and lifts got in the way, and this is just tidying up the loose ends?
     
Thread Status:
Not open for further replies.

Share This Page