    Are there many stations that have bay platforms that would be more useful now had they been built as through platforms?
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. CptCharlee

    CptCharlee Member

    Messages:
    55
    Joined:
    31 Jan 2018
    Edinburgh is a prime example. Suffers greatly from lack of through platforms.
     
  4. sw1ller

    sw1ller Established Member

    Messages:
    1,284
    Joined:
    4 Jan 2013
    Chester. Forever shunting stuff out the bays to go in the opposite direction.
     
  5. adamedwards

    adamedwards Member

    Messages:
    299
    Joined:
    4 Apr 2016
    Location:
    Hatfield, Herts
    One could argue these days Manchester Piccadilly is a very small through station with 12 bays attached.
     
  6. Llama

    Llama Established Member

    Messages:
    1,401
    Joined:
    29 Apr 2014
    Bradford stations...
     
  7. swt_passenger

    swt_passenger Veteran Member

    Messages:
    21,424
    Joined:
    7 Apr 2010
    Fareham. If the middle platform was still connected in the Portsmouth direction, (ie track layout reverted to as built condition), then it would be much easier for Southern’s short workings when running late, which they do on a regular basis.
     
    Last edited: 4 May 2019
  8. pieguyrob

    pieguyrob Member

    Messages:
    356
    Joined:
    27 Oct 2018
    How about Ormskirk! It was a through platform that is now two bays, so is the opposite way round.
     
  9. Aictos

    Aictos Established Member

    Messages:
    8,802
    Joined:
    28 Apr 2009
    How about Bedford? Bearing in mind it only has three platforms capable of taking 8/12 car EMUs, by remodelling the station and extending the bay platform though the ticket hall to take 12 cars that surely would be less expensive then remodelling the layout and building a extra platform for the Up Fast?

    Also Hertford North and Gordon Hill were built with two island platforms with the outer faces as bays, by making them though platforms both stations can be used to loop services.

    As to unbuilt, how about Stevenage platform 5? I think it’s got passive support to be converted to being a though line in the future?
     
  10. ajs1981

    ajs1981 Member

    Messages:
    13
    Joined:
    10 Sep 2017
    Perhaps Leamington platform 4? Sometimes there seems to be a queue for P3 during disruption. Although it might just move the delay further along the line as there is only one track in each direction until further along the line?
     
  11. Ianno87

    Ianno87 Established Member

    Messages:
    5,812
    Joined:
    3 May 2015
    You could probably add every London terminal! If you were planning railways from scratch today, you wouldn't have come up with a ring of terminals around London for every suburban route! Hence Thameslink, Crossrail and Crossrail 2 to fix this historic constraint.
     
  12. Ken H

    Ken H Established Member

    Messages:
    2,121
    Joined:
    11 Nov 2018
    Location:
    in Greece on holiday
    the victorians took fright at the idea of railways crossing London. Which is why KX, Ss P, Euston and Marylebone are on the marylebone Road, and the southern stations just got over the river and stopped. Dunno how what is Thameslink snuck through!
     
  13. ijmad

    ijmad Established Member

    Messages:
    1,277
    Joined:
    7 Jan 2016
    Location:
    UK
    All of the London terminals
     
  14. InOban

    InOban Established Member

    Messages:
    2,380
    Joined:
    12 Mar 2017
    It has 6. Isn't that enough?
     
  15. Wirewiper

    Wirewiper Member

    Messages:
    597
    Joined:
    14 Nov 2017
    Location:
    BET & TQY
    It had the Metropolitan Railway as a precedent - the idea of railways crossing Central London in tunnel had gained acceptance.
     
  16. swt_passenger

    swt_passenger Veteran Member

    Messages:
    21,424
    Joined:
    7 Apr 2010
    ...and I suspect the rationale was originally more about getting livestock and produce to Smithfield than a through passenger service as we know it today.
     
  17. Tom Maddox

    Tom Maddox Member

    Messages:
    489
    Joined:
    14 Apr 2019
    Location:
    Frodsham
    Absolutely. Just visit platforms 13 & 14.
     
  18. xotGD

    xotGD Established Member

    Messages:
    2,431
    Joined:
    4 Feb 2017
    Swansea

    Glasgow

    And another vote for Bradford
     
  19. PaulLothian

    PaulLothian Member

    Messages:
    637
    Joined:
    27 Sep 2010
    Location:
    Linlithgow
    Nine, I think, thanks to the wonders of double length platforms and cross-overs. Also capacity to add an extra through platform after extension work on 5/6 and 12.
     
  20. Ken H

    Ken H Established Member

    Messages:
    2,121
    Joined:
    11 Nov 2018
    Location:
    in Greece on holiday
    Ludgate Hill was overground and busy. right by st pauls cathedral
     
  21. vlad

    vlad Member

    Messages:
    412
    Joined:
    13 May 2018
    I think Stoke has had several bays in its time (now reduced to just the one) but it's only ever had the 2 through platforms. If everything runs to timetable then there aren't any problems but how often does that happen?
     
  22. edwin_m

    edwin_m Veteran Member

    Messages:
    16,961
    Joined:
    21 Apr 2013
    Location:
    Nottingham
    However what is now Thameslink avoided the really expensive areas in the City itself, passing through a gap of relatively cheaper land between the City and the West End. That's probably why Smithfield was there as well.
     
  23. 30907

    30907 Established Member

    Messages:
    7,754
    Joined:
    30 Sep 2012
    Location:
    Airedale
    It wasn't called the Metropolitan Widened Lines for nothing! And interestingly no other full-sized railway was built across Central London until Crossrail, though there were some post-WW2 (and other) plans.

    Back on topic - pedant mode, do pure terminus stations have bay platforms? I would only use the word to describe short platforms like the one-time parcels sidings/docks/bays between 11 and 12 (now 14) at Waterloo.

    Leeds has bays 13/14 which could in theory be connected, but it would cause enormous circulation problems.
     
  24. L&Y Robert

    L&Y Robert Member

    Messages:
    574
    Joined:
    22 Apr 2012
    Location:
    Banbury 3m South
    They recently did this at Banbury
     
  25. Surreytraveller

    Surreytraveller Established Member

    Messages:
    1,534
    Joined:
    21 Oct 2009
    In fact, all the Underground lines that have been extended into the suburbs taking over existing lines after The War could be considered as early versions of Thameslink, such as the Central to West Ruislip/Epping etc
     
  26. martinsh

    martinsh Established Member

    Messages:
    1,584
    Joined:
    27 Jan 2011
    Location:
    Considering a move to Memphis
    Wolverhampton. Connect platforms 5 & 6 through the (soon to be demolished) booking hall
     
  27. mark-h

    mark-h Member

    Messages:
    283
    Joined:
    14 Jan 2015
    Edinburgh only has 6 independent through platforms- certain combinations of platform use will result in other platforms being blocked from one direction, effectively making them into bay platforms.
     
  28. PaulLothian

    PaulLothian Member

    Messages:
    637
    Joined:
    27 Sep 2010
    Location:
    Linlithgow
    True enough, although on my regular trips through Waverley it is not that common to see all four sections of the platforms with crossovers in use simultaneously - one of the features of interest I tend to look out for. As a serious question, are there current services that TOCs would organise differently if there were more through tracks, or is this about future-proofing?
     
  29. Ianno87

    Ianno87 Established Member

    Messages:
    5,812
    Joined:
    3 May 2015
    Edinburgh has:

    West End - 4 track approach with numerous diverging routes after Haymarket

    East End - 2 track approach with only two relatively minor brances (Tweedbank and North Berwick)

    So having lots of west facing bays makes sense - not sure where you'd send all the through trains to (or where the capacity to fit them to the east would come from)
     
  30. cornishjohn

    cornishjohn Member

    Messages:
    44
    Joined:
    1 Feb 2011
    There are occasional Ayr-North Berwick services. Also I think a few North Berwick - Haymarket. I'm surprised there aren't more like this actually - a quick crayoning gives Tweedbank to the fife loop?
     
  31. FelixtheCat

    FelixtheCat Established Member

    Messages:
    3,128
    Joined:
    23 Jul 2015
    Location:
    Edinburgh, London, or somewhere else
    3 trains per day run beyond Waverley from North Berwick. This looks like it reduces to just 1 after the timetable change.
    4 trains per day run from beyond Waverley to North Berwick. This looks like it reduces 1 after the timetable change.

    There are rush hour services between Tweedbank and Fife. There are also some Tweedbank services that run through to South Gyle.
     