• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Timing load for new GWR Trains

Status
Not open for further replies.

baz2277

Member
Joined
23 Jun 2013
Messages
60
Hi all,

What is the spec on Real Train Times for the new GWR Trains? Are they still classed as 'High Speed Train' or something else? Not finding much apart from Electric Multiple Unit for some out of Paddington. Need to see what is available from Bristol TM this Thursday.

Cheers
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
10,033
Location
here to eternity
Hi all,

What is the spec on Real Train Times for the new GWR Trains? Are they still classed as 'High Speed Train' or something else? Not finding much apart from Electric Multiple Unit for some out of Paddington. Need to see what is available from Bristol TM this Thursday.

Cheers

All services operated by Class 800s are timed as HSTs on RTT for the time being. I'm not sure when a "Class 800" timing load will be applied.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,808
Location
Yorkshire
Hi all,

What is the spec on Real Train Times for the new GWR Trains? Are they still classed as 'High Speed Train' or something else? Not finding much apart from Electric Multiple Unit for some out of Paddington. Need to see what is available from Bristol TM this Thursday.

Cheers
By "spec in Real Train Times" I think you mean timing load in the open data feed (used by sites such as Real Time Trains, Open Train Times etc)?

The timing loads used for these services are currently HST.
 

Johnny Lewis

Member
Joined
9 Jan 2011
Messages
334
Location
York
All services operated by Class 800s are timed as HSTs on RTT for the time being. I'm not sure when a "Class 800" timing load will be applied.

Unlikely to see a specific IET timing load before May 2019, now that GWR's big timetable rewrite has been postponed until then.
 
Status
Not open for further replies.

Top