Timing load for new GWR Trains

Discussion in 'Allocations, Diagrams & Timetables' started by baz2277, 11 Aug 2018.

  1. baz2277

    baz2277 Member

    Messages:
    38
    Joined:
    23 Jun 2013
    Hi all,

    What is the spec on Real Train Times for the new GWR Trains? Are they still classed as 'High Speed Train' or something else? Not finding much apart from Electric Multiple Unit for some out of Paddington. Need to see what is available from Bristol TM this Thursday.

    Cheers
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. Mag_seven

    Mag_seven Established Member

    Messages:
    3,445
    Joined:
    1 Sep 2014
    Location:
    My house
    All services operated by Class 800s are timed as HSTs on RTT for the time being. I'm not sure when a "Class 800" timing load will be applied.
     
  4. yorkie

    yorkie Administrator Staff Member Administrator

    Messages:
    39,202
    Joined:
    6 Jun 2005
    Location:
    Yorkshire
    By "spec in Real Train Times" I think you mean timing load in the open data feed (used by sites such as Real Time Trains, Open Train Times etc)?

    The timing loads used for these services are currently HST.
     
  5. Johnny Lewis

    Johnny Lewis Member

    Messages:
    205
    Joined:
    9 Jan 2011
    Location:
    York
    Unlikely to see a specific IET timing load before May 2019, now that GWR's big timetable rewrite has been postponed until then.
     

Share This Page