TPE Mark 5A coaching stock progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ben Bow

Member
Joined
20 Sep 2018
Messages
342
68022 leading 68031 ("Felix") are heading to Scarborough on 0P68. 68020 should also be running to Scarborough from York with a driver training trip.
 

Fez14

Member
Joined
30 Dec 2018
Messages
93
According to real-time trains light locos from Longsight soon to arrive in Scarborough, with a return trip later today
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
According to real-time trains light locos from Longsight soon to arrive in Scarborough, with a return trip later today
68022 ‘Resolution’ leads 68031 ‘Felix’. Pic at York below. Apologies for the late post, I got the pic then had to run for work;)
B9A03A61-EBFF-442A-B140-60B9AB6EB1D4.jpeg
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
0M68 10:10 Scarborough to Longsight was 68022 ‘Resolution’ returning graffitied 68023 ‘Achilles’.

So, 68020 ‘Reliance’ is at the York and 68031 ‘Felix’ is at Scarborough, both for driver training/refresher trips.
 

Ben Bow

Member
Joined
20 Sep 2018
Messages
342
0M68 10:10 Scarborough to Longsight was 68022 ‘Resolution’ returning graffitied 68023 ‘Achilles’.

So, 68020 ‘Reliance’ is at the York and 68031 ‘Felix’ is at Scarborough, both for driver training/refresher trips.

Thank you for the updated "sit-rep".

I went for the panoramic shot including 68020, which was person free :)
 

SP Man

Member
Joined
26 Aug 2018
Messages
146
I see for (at least) the last two weeks there has been a move with mk.5a coaches from Longsight to Crewe South Yard on a Monday, with a return move later in the week. It seems as though this week's return move is taking place tomorrow (see link below). Can anybody state what the purpose of these moves is please?

http://www.realtimetrains.co.uk/train/K97557/2019/03/14/advanced
Air con testing, safes the MID being filled with fumes and dragging it in to the air con unit.
 

angryskipfan

Member
Joined
23 Aug 2017
Messages
21
NIR3551 raised during testing on wed night related to ASDO operation on stock. Possibly reason testing on mk5 has been quiet of late. Affects other uk CAF projects as well. Mitigation in place and CAF working on long term fix.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
NIR3551 raised during testing on wed night related to ASDO operation on stock. Possibly reason testing on mk5 has been quiet of late. Affects other uk CAF projects as well. Mitigation in place and CAF working on long term fix.
What's NIR3551? And, what's ASDO?
Thanks :)
 

D6700

Member
Joined
13 Mar 2010
Messages
649
Automatic Selective Door Operation/Opening

Since these aren't passenger trains, unless doors were opening whilst on the move, which could make the trains go out of gauge and also represent a safety risk to any staff working on board, I wouldn't have thought such an issue should prevent testing. But this is the UK... ;)
 

Erniescooper

Member
Joined
27 Mar 2010
Messages
518
NIR is National Incident Report and is a system that allows the engineering departments of TOCs to report safety issues that might be applicable to trains operated by other TOCs
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,540
Location
"Marston Vale mafia"
Automatic Selective Door Operation/Opening

Since these aren't passenger trains, unless doors were opening whilst on the move, which could make the trains go out of gauge and also represent a safety risk to any staff working on board, I wouldn't have thought such an issue should prevent testing. But this is the UK... ;)

If the current testing is for a period of fault-free running, clearly it resets that particular clock.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
NIR is National Incident Report and is a system that allows the engineering departments of TOCs to report safety issues that might be applicable to trains operated by other TOCs
Is it operated by the RSSB*, or the train operating companies?

* Rail Safety & Standards Board
 

Ben Bow

Member
Joined
20 Sep 2018
Messages
342
NIR3551 raised during testing on wed night related to ASDO operation on stock. Possibly reason testing on mk5 has been quiet of late. Affects other uk CAF projects as well. Mitigation in place and CAF working on long term fix.

Was the actual incident which NIR3551 relates to on Wednesday night, or previously?
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
Automatic Selective Door Operation/Opening

Since these aren't passenger trains, unless doors were opening whilst on the move, which could make the trains go out of gauge and also represent a safety risk to any staff working on board, I wouldn't have thought such an issue should prevent testing. But this is the UK... ;)
It could be that all other testing is now complete and it’s just ASDO that needs signing off;)
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
Was the actual incident which NIR3551 relates to on Wednesday night, or previously?
Good point. I might be looking in the wrong place but I didn’t notice any test trains running this week. Can ASDO be tested whilst a train is static?

I assume ASDO has been tested on the Leeds/Scarborough trips and those have shown some problems.
 

Ben Bow

Member
Joined
20 Sep 2018
Messages
342
Good point. I might be looking in the wrong place but I didn’t notice any test trains running this week. Can ASDO be tested whilst a train is static?

I assume ASDO has been tested on the Leeds/Scarborough trips and those have shown some problems.

There was an incident with doors at Greenfield during a test run and that was a Wednesday, but 4 weeks ago, which is why I sought clarification.
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
There was an incident with doors at Greenfield during a test run and that was a Wednesday, but 4 weeks ago, which is why I sought clarification.
Many thanks for that, I hadn’t realised the Greenfield incident was down to doors. That’s certainly a bit of a show stopper until they get that one sortedo_O
 

dilbertphil

Member
Joined
28 Jan 2018
Messages
165
From the rumours circulating my depot it appears they just cant get these first couple of sets through fault free mileage. Training has been put off on Mk5's and we dont know when it will start again. I don't think we will see these trains in service anytime soon.
 