TPE Mark 5A coaching stock progress

Discussion in 'Traction & Rolling Stock' started by sprinterguy, 11 Mar 2017.

  1. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    I wish the Nova 3s would keep coming back;)

    Still, something to look forward to in the autumn when these might just about start...
     
  2. Fez14

    Fez14 Member

    Messages:
    51
    Joined:
    30 Dec 2018
    Not sure how old this is but its the best video or image I've seen of any graffiti. There were reports that Nova 2s and 3s have been vandalised. If this is the second Mk5a set to be vandalised then that really is shocking
     
  3. Bletchleyite

    Bletchleyite Veteran Member

    Messages:
    37,025
    Joined:
    20 Oct 2014
    Location:
    Up and down the south WCML (mostly)
    You'd think that as soon as one got done they would bring in some contracted security guards. Which is the thing contracted security guards shoud be doing, not checking tickets a la Northern.
     
  4. ainsworth74

    ainsworth74 Moderator Staff Member Moderator

    Messages:
    19,605
    Joined:
    16 Nov 2009
    Location:
    Redcar
    Depends on how much it costs to fix the graffiti versus entering into said contract. I'd gamble that it's probably cheaper to just fix the graffiti.
     
  5. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    This is the same set as reported awhile back, occurred at Scarborough on the night of 27th February. There have been problems at Scarborough before with charter stock suffering this fate.

    I’m not sure if there was a specific reason to stable the stock at Scarborough, but from a security point of view working back to York and putting it in platform 2 (bay platform) might have been better, there was only a single 68 in there on that night.
     
  6. Jozhua

    Jozhua Member

    Messages:
    282
    Joined:
    6 Jan 2019
    Do we know if the graffiti will effect the timescale for their entry into service?

    They're also going to have to factor in the 20 year overhaul of the fleet by the time they get to using them ;)
     
  7. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    Or tag an another 13 sets on to the end of the Class 802 order;)

    It was mentioned earlier that part of the Mk5a spec is for graffiti to be easily removed, how kind of the Scarborough ‘artists’ to test that out for free;)

    Pic of 68029 at York this afternoon, I think it’s probably rusted to the track having stood for so long...
    7A783293-E184-4877-B76B-B05A248F5EB5.jpeg
     
  8. SP Man

    SP Man Member

    Messages:
    118
    Joined:
    26 Aug 2018
    It had to stay over at Scarborough to allow it to be the first train over the route in the morning for track circuit testing with the wheels and track being left the longest between use to ensure they activate Track circuits.
     
  9. Ben Bow

    Ben Bow Member

    Messages:
    143
    Joined:
    20 Sep 2018
    Now that driver training has finished at York for the time being maybe we will see them move back Manchester way. To be fair 029 did get to move a couple of loco lengths during each course as the driver's first 'feel' of a 68 in motion - 021 on the other hand....
     
  10. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    Many thanks for that, greatly appreciated.
     
  11. scarby

    scarby Member

    Messages:
    413
    Joined:
    20 May 2011
    Not to mention the new Scarborough depot, which according to TPE: "The new structure, which is planned to open in summer 2018, will maintain our brand new trains."

    When I went past on a train last week, there still isn't anything constructed above ground level, although I think the track work is more or less finished.
     
  12. YorkshireBear

    YorkshireBear Established Member

    Messages:
    7,452
    Joined:
    23 Jul 2010
    You can chuck a basic steel frame up in about a week once the foundations are done.
     
  13. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    According to ‘Falmer’s Almanac’ summer 2019 ends on 22nd September;)

    Let’s all keep our fingers crossed:)
     
  14. notlob.divad

    notlob.divad Established Member

    Messages:
    1,109
    Joined:
    19 Jan 2016
    I suppose then it will only be 12 months late. Any idea what the delay repay compensation for that would be?
     
  15. BMIFlyer

    BMIFlyer Member

    Messages:
    608
    Joined:
    13 Mar 2017
    The reason being issues with the local council to do with planning.

    All good now however.
     
  16. Ben Bow

    Ben Bow Member

    Messages:
    143
    Joined:
    20 Sep 2018
    It wasn't required either, better to build it and use it, than leave it empty and unused at the mercy of vandals for months/years.
     
  17. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    York round up for anyone visiting:

    68021 ‘Tireless’ and 68029 on Siemens Depot.

    68020 ‘Reliance’ stables overnight in platform 2, daytime driver training runs to Scarborough, though not always as many trips as Real Time Trains suggests!

    68027 York P SD (siding adjacent to the station). Seems to be broken, some say wheel flats but can anyone confirm?

    Pic below of 68020 this evening.

    9C588EAC-B596-4C56-BFEE-AA97F6EA21B8.jpeg
     
  18. 86247

    86247 Member

    Messages:
    13
    Joined:
    12 Feb 2017
    was 68029 at the Siemens depot on Saturday about 13.00 couldn't id the loco as I went past it was behind 68021
     
  19. Ben Bow

    Ben Bow Member

    Messages:
    143
    Joined:
    20 Sep 2018
    Yes, 68027 has wheel flats and is awaiting a visit to a wheel lathe.
    68029 would have been on the depot on Saturday.
    Thanks for the update by the way.
     
  20. 86247

    86247 Member

    Messages:
    13
    Joined:
    12 Feb 2017
    thanks a lot
     
  21. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    Many thanks for the shout on 68027. It has been out of traffic for quite some time now, being dumped in platform 2 at York from the end of January before shuffling over to the P SD.
     
  22. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
  23. dilbertphil

    dilbertphil Member

    Messages:
    139
    Joined:
    28 Jan 2018
    It's a move to get the vandalised 68 back to Longsight to be sorted.
     
  24. scarby

    scarby Member

    Messages:
    413
    Joined:
    20 May 2011
    Regarding the graffiti attacks, there have been units and locos kept overnight at Scarborough station for as long as I can remember, and although someone could easily enter by jumping over a wall, climbing a small fence, etc., there's never been an issue as far as I'm aware that people would go to the station right in the depths of the night and damage things. But I guess there's a first, and it seems second and third time for everything.
     
  25. sjpowermac

    sjpowermac Member

    Messages:
    390
    Joined:
    26 May 2018
    Many thanks for that, I didn’t know about the vandalism to the 68.
     
  26. dilbertphil

    dilbertphil Member

    Messages:
    139
    Joined:
    28 Jan 2018
    Screenshot_20190312-120154_WhatsApp.jpg
     
  27. Fez14

    Fez14 Member

    Messages:
    51
    Joined:
    30 Dec 2018
    That'll come off easy? or will it need re-wrapping?
     
  28. 61653 HTAFC

    61653 HTAFC Established Member

    Messages:
    9,659
    Joined:
    18 Dec 2012
    Location:
    Another planet...
  29. ash39

    ash39 Established Member

    Messages:
    1,262
    Joined:
    8 Feb 2012
    No 68 in York Parcels Sidings as of 12/03
     
  30. Spartacus

    Spartacus Established Member

    Messages:
    1,090
    Joined:
    25 Aug 2009
    Looks like it. From what I can gather there's a great deal of effort goes into being the first to vandalise new equipment or buildings.
     